Difference between revisions of "Run Meeting: April 9th, 2018"
Jump to navigation
Jump to search
(→Status) |
(→Status) |
||
Line 12: | Line 12: | ||
*kin15/kin16 in progress. | *kin15/kin16 in progress. | ||
*Beam study during day shift. | *Beam study during day shift. | ||
+ | *Tuesday 8am to noon for cavity recovery and 2nd pass separator restoration. | ||
*Controlled access: Hall A walkthrough, detector checklist | *Controlled access: Hall A walkthrough, detector checklist | ||
Revision as of 08:05, 9 April 2018
Back to:
4:00PM Run Meeting, Counting house meeting room (200C)
RC: Shujie Li
Status
- kin15/kin16 in progress.
- Beam study during day shift.
- Tuesday 8am to noon for cavity recovery and 2nd pass separator restoration.
- Controlled access: Hall A walkthrough, detector checklist
Slides
BlueJeans connection info:
To join the Meeting: https://bluejeans.com/372278653