Difference between revisions of "Run Meeting: April 9th, 2018"
Jump to navigation
Jump to search
(→Status) |
m (→Status) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 12: | Line 12: | ||
*kin15/kin16 in progress. | *kin15/kin16 in progress. | ||
*Beam study during day shift. | *Beam study during day shift. | ||
− | *Controlled access: Hall A walkthrough, | + | *Tuesday 9am to noon for cavity recovery and 2nd pass separator restoration. |
+ | *Controlled access from 9am to 3pm: | ||
+ | Hall A walkthrough (Doug), coincidence trigger test (Florian), and LHRS magnet work (Jack) | ||
==Slides== | ==Slides== |
Latest revision as of 14:42, 9 April 2018
Back to:
4:00PM Run Meeting, Counting house meeting room (200C)
RC: Shujie Li
Status
- kin15/kin16 in progress.
- Beam study during day shift.
- Tuesday 9am to noon for cavity recovery and 2nd pass separator restoration.
- Controlled access from 9am to 3pm:
Hall A walkthrough (Doug), coincidence trigger test (Florian), and LHRS magnet work (Jack)
Slides
BlueJeans connection info:
To join the Meeting: https://bluejeans.com/372278653