Difference between revisions of "Run Meeting: April 16th, 2018"
(Created page with "'''Back to:''' : Main Page : Daily Run Meetings 4:00PM Run Meeting, Counting house meeting room (200C) '''RC:''' Florian Hauenstein [h...") |
|||
Line 16: | Line 16: | ||
Sunday: | Sunday: | ||
8:00: Move LHRS to 17.8 degrees | 8:00: Move LHRS to 17.8 degrees | ||
+ | |||
8:00 - 13:00: Collect elastic hydrogen data for momentum calibration and a little bit other data on tritium and He3 (around miss = 0) | 8:00 - 13:00: Collect elastic hydrogen data for momentum calibration and a little bit other data on tritium and He3 (around miss = 0) | ||
+ | |||
13:00 -15:00: Move of RHRS and LHRS to "slow" kinematics in coincidence with a longer beam down time (great no effective beam loss!) | 13:00 -15:00: Move of RHRS and LHRS to "slow" kinematics in coincidence with a longer beam down time (great no effective beam loss!) | ||
+ | |||
After getting beam back at around 17:00: Starting data taking with first set of 500mC charge on tritium done and about 220mC on He3 done. Aim is to collect about 6.6C on each target. | After getting beam back at around 17:00: Starting data taking with first set of 500mC charge on tritium done and about 220mC on He3 done. Aim is to collect about 6.6C on each target. | ||
Revision as of 09:02, 16 April 2018
Back to:
4:00PM Run Meeting, Counting house meeting room (200C)
RC: Florian Hauenstein
e'p
Friday - Sunday, 8:00: Data taking finished on "fast" kinematics. About 450 good e'p events for both targets, tritium and He3, in addition to data on deuterium and dummy Sunday: 8:00: Move LHRS to 17.8 degrees
8:00 - 13:00: Collect elastic hydrogen data for momentum calibration and a little bit other data on tritium and He3 (around miss = 0)
13:00 -15:00: Move of RHRS and LHRS to "slow" kinematics in coincidence with a longer beam down time (great no effective beam loss!)
After getting beam back at around 17:00: Starting data taking with first set of 500mC charge on tritium done and about 220mC on He3 done. Aim is to collect about 6.6C on each target.
Monday: Hall in controlled access for walkthrough and detector checklist.
Evening: BCM calibration if beam is stable.
Tomorrow Day: RF recovery and another walkthrough at around 11:30a.m.
Slides
BlueJeans connection info:
To join the Meeting: https://bluejeans.com/372278653