Difference between revisions of "Run Meeting: April 16th, 2018"

From Tritium Experiments Group
Jump to navigation Jump to search
(Created page with "'''Back to:''' : Main Page : Daily Run Meetings 4:00PM Run Meeting, Counting house meeting room (200C) '''RC:''' Florian Hauenstein [h...")
 
 
(One intermediate revision by one other user not shown)
Line 16: Line 16:
 
Sunday:
 
Sunday:
 
8:00: Move LHRS to 17.8 degrees
 
8:00: Move LHRS to 17.8 degrees
 +
 
8:00 - 13:00: Collect elastic hydrogen data for momentum calibration and a little bit other data on tritium and He3 (around miss = 0)
 
8:00 - 13:00: Collect elastic hydrogen data for momentum calibration and a little bit other data on tritium and He3 (around miss = 0)
 +
 
13:00 -15:00: Move of RHRS and LHRS to "slow" kinematics in coincidence with a longer beam down time (great no effective beam loss!)
 
13:00 -15:00: Move of RHRS and LHRS to "slow" kinematics in coincidence with a longer beam down time (great no effective beam loss!)
 +
 
After getting beam back at around 17:00: Starting data taking with first set of 500mC charge on tritium done and about 220mC on He3 done. Aim is to collect about 6.6C on each target.
 
After getting beam back at around 17:00: Starting data taking with first set of 500mC charge on tritium done and about 220mC on He3 done. Aim is to collect about 6.6C on each target.
  
Line 28: Line 31:
  
 
==Slides==
 
==Slides==
 
+
Shujie: [https://hallaweb.jlab.org/experiment/Tritium/E12-11-112/tritium_page/index.php tritium runlist webpage]
 
----------------------------------
 
----------------------------------
 
BlueJeans connection info:
 
BlueJeans connection info:

Latest revision as of 14:57, 16 April 2018

Back to:

Main Page
Daily Run Meetings

4:00PM Run Meeting, Counting house meeting room (200C)

RC: Florian Hauenstein

(shifts)


e'p

Friday - Sunday, 8:00: Data taking finished on "fast" kinematics. About 450 good e'p events for both targets, tritium and He3, in addition to data on deuterium and dummy Sunday: 8:00: Move LHRS to 17.8 degrees

8:00 - 13:00: Collect elastic hydrogen data for momentum calibration and a little bit other data on tritium and He3 (around miss = 0)

13:00 -15:00: Move of RHRS and LHRS to "slow" kinematics in coincidence with a longer beam down time (great no effective beam loss!)

After getting beam back at around 17:00: Starting data taking with first set of 500mC charge on tritium done and about 220mC on He3 done. Aim is to collect about 6.6C on each target.

Monday: Hall in controlled access for walkthrough and detector checklist.

Evening: BCM calibration if beam is stable.

Tomorrow Day: RF recovery and another walkthrough at around 11:30a.m.


Slides

Shujie: tritium runlist webpage


BlueJeans connection info:

To join the Meeting: https://bluejeans.com/372278653