Difference between revisions of "Run Meeting: May 2nd, 2018"
Jump to navigation
Jump to search
(set up daily run page) |
m (adjusted image size) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 11: | Line 11: | ||
==(e,e'p)== | ==(e,e'p)== | ||
− | Data taking finished at 7AM. | + | * Problem with the L HRS motor controller |
+ | * Moved to x=1 kinematics for the last owl shift | ||
+ | * Data taking finished at 7AM. | ||
==xB>1== | ==xB>1== | ||
Tasks for today: | Tasks for today: | ||
− | * Accelerator | + | * Accelerator |
− | * Experiment | + | ** RF Recovery |
+ | ** Switch to first pass beam | ||
+ | * Experiment | ||
** Change trigger | ** Change trigger | ||
− | ** Move to new angle settings | + | ** Reconfigure CODA |
+ | ** Move to new angle/momentum settings | ||
** Reverse polarity | ** Reverse polarity | ||
* Run | * Run | ||
** Move from phase-1 to phase-3 | ** Move from phase-1 to phase-3 | ||
+ | |||
+ | [[File:Screen_Shot_2018-05-02_at_15.22.06_.png|x500px]] | ||
==Slides== | ==Slides== |
Latest revision as of 14:28, 2 May 2018
Back to:
4:00PM Run Meeting, Counting house meeting room (200C)
RC: Axel Schmidt
(e,e'p)
- Problem with the L HRS motor controller
- Moved to x=1 kinematics for the last owl shift
- Data taking finished at 7AM.
xB>1
Tasks for today:
- Accelerator
- RF Recovery
- Switch to first pass beam
- Experiment
- Change trigger
- Reconfigure CODA
- Move to new angle/momentum settings
- Reverse polarity
- Run
- Move from phase-1 to phase-3