Difference between revisions of "Meeting-7DEC2015"

From Tritium Experiments Group
Jump to navigation Jump to search
 
(17 intermediate revisions by the same user not shown)
Line 1: Line 1:
  
Links to talks.
+
=== Introduction ===
  
        Summary of Experiments
+
Jefferson Lab Status by Bob McKeown
 +
[http://hallaweb.jlab.org/experiment/Triton/Meetings/7Dec2015/BMCK_Tritium_Dec15.pptx (pptx)]
  
E12-14-011 Proton and Neutron Momentum Distributions in A = 3 Asymmetric Nuclei Larry Weinstein
+
Hall A Status by Thia Keppel
 +
[http://hallaweb.jlab.org/experiment/Triton/Meetings/7Dec2015/Keppel-3H_collab.pptx (pptx)]
  
E12-11-112 Precision Measurement of the Isospin Dependence in the 2N and 3N Short Range Correlation Region Patricia Solvignon
+
=== Summary of Tritium Experiments ===
  
E12-10-103 Measurement of the F2n/F2p, d/u Ratios and A=3 EMC Effect off Mirror Nuclei Makis Petratos
+
E12-14-011: Proton and Neutron Momentum Distributions in A = 3 Asymmetric Nuclei by Larry Weinstein
 +
[http://hallaweb.jlab.org/experiment/Triton/Meetings/7Dec2015/Weinstein-TritiumMeeting2015Dec.pptx (pptx)]
  
E12-14-009 Ratio of the Electric Form Factor in the Mirror Nuclei 3He and 3H Douglas Higinbotham  
+
E12-11-112: Precision Measurement of the Isospin Dependence in the 2N and 3N Short Range Correlation Region by Patricia Solvignon
+
[http://hallaweb.jlab.org/experiment/Triton/Meetings/7Dec2015/Solvigtritiumcollab_xlt3.pdf (pptx)]
Status of Experiment (10:45-12:15)
+
 
10:45 Target Status Dave Meekins
+
E12-10-103: Measurement of the F2n/F2p, d/u Ratios and A=3 EMC Effect off Mirror Nuclei by Makis Petratos
11:05 Infrastructure for Tritium Robin Wines
+
[http://hallaweb.jlab.org/experiment/Triton/Meetings/7Dec2015/Petratos-Tritium-Collaboration-Record-December-2015.pptx (pptx)]
11:25 BigBite Equipment Status TBD
+
 
11:45 HRS Status Barak Schmookler
+
E12-14-009: Ratio of the Electric Form Factor in the Mirror Nuclei 3He and 3H by Douglas Higinbotham
12:00 Normal Conducting HRS Quad Issues (discussion)
+
[http://hallaweb.jlab.org/experiment/Triton/Meetings/7Dec2015/Higinbotham-Elastic-E12-14-009.pptx (pttx)]
  Lunch Break (12:15 – 1:30)
+
 
Hall Configuration, Documentation, Training, Reviews (1:30 - 3:00)  
+
=== Status of Experimental Equipment ===
1:30 Hall A & Target Safety Issues Dave Meekins
+
1:50 Experiment Kinematics (Use of BigBite and/or HRS) John Arrington
+
Target Status by Dave Meekins
2:10 Documentation Douglas Higinbotham
+
[http://hallaweb.jlab.org/experiment/Triton/Meetings/7Dec2015/Meekins-Hall%20A%20Tritium%20Target%20Status.pptx (pptx)]
2:30 Upcoming Reviews and Requirements Patrizia Rossi
+
 
  Coffee Break
+
Infrastructure for Tritium by Robin Wines
Optimization of Experiment Plan with Tritium (3:15 - 4:00)
+
[http://hallaweb.jlab.org/experiment/Triton/Meetings/7Dec2015/Wines-Tritium-dec2015-wines.pptx (pptx)]
  Group Discussion to finalize best combined run plan Thia Keppel
+
 
Discussion & Assignment of Tasks (4:00 – 4:45)
+
BigBite Equipment Status by Taylor Hague
  Group Discussion Douglas Higinbotham
+
[http://hallaweb.jlab.org/experiment/Triton/Meetings/7Dec2015/Tyler-BigBiteStatusUpdate-07dec2015.pptx (pptx)]
 +
 
 +
HRS Status by Barak Schmookler
 +
[http://hallaweb.jlab.org/experiment/Triton/Meetings/7Dec2015/HRS_Status_Tritium-Barak.pdf (pdf)]
 +
 
 +
===  Hall Configuration, Documentation, Training, Reviews ===
 +
 
 +
Hall A & Target Safety Issues by Dave Meekins
 +
[http://hallaweb.jlab.org/experiment/Triton/Meetings/7Dec2015/Meekins-Hall%20A%20Tritium%20Safety.pptx (pptx)]
 +
 
 +
Experiment Kinematics (Use of BigBite and/or HRS) by John Arrington
 +
[http://hallaweb.jlab.org/experiment/Triton/Meetings/7Dec2015/Arrington_Tritium_Dec2015.ppt (ppt)]
 +
 
 +
Documentation by Douglas Higinbotham
 +
[http://hallaweb.jlab.org/experiment/Triton/Meetings/7Dec2015/Higinbotham-Documentation.pptx (pptx)]
 +
 
 +
Upcoming Reviews and Requirements by Patrizia Rossi
 +
[http://hallaweb.jlab.org/experiment/Triton/Meetings/7Dec2015/Rossi_3H_ERR_v1.pptx (pptx)]
 +
 
 +
Group Discussion to finalize best combined run plan Thia Keppel
 +
[http://hallaweb.jlab.org/experiment/Triton/Meetings/7Dec2015/Keppel-3H_collab_discussion.pptx (pptx)]

Latest revision as of 12:28, 12 February 2016

Introduction

Jefferson Lab Status by Bob McKeown (pptx)

Hall A Status by Thia Keppel (pptx)

Summary of Tritium Experiments

E12-14-011: Proton and Neutron Momentum Distributions in A = 3 Asymmetric Nuclei by Larry Weinstein (pptx)

E12-11-112: Precision Measurement of the Isospin Dependence in the 2N and 3N Short Range Correlation Region by Patricia Solvignon (pptx)

E12-10-103: Measurement of the F2n/F2p, d/u Ratios and A=3 EMC Effect off Mirror Nuclei by Makis Petratos (pptx)

E12-14-009: Ratio of the Electric Form Factor in the Mirror Nuclei 3He and 3H by Douglas Higinbotham (pttx)

Status of Experimental Equipment

Target Status by Dave Meekins (pptx)

Infrastructure for Tritium by Robin Wines (pptx)

BigBite Equipment Status by Taylor Hague (pptx)

HRS Status by Barak Schmookler (pdf)

Hall Configuration, Documentation, Training, Reviews

Hall A & Target Safety Issues by Dave Meekins (pptx)

Experiment Kinematics (Use of BigBite and/or HRS) by John Arrington (ppt)

Documentation by Douglas Higinbotham (pptx)

Upcoming Reviews and Requirements by Patrizia Rossi (pptx)

Group Discussion to finalize best combined run plan Thia Keppel (pptx)