Difference between revisions of "Run Meeting: Oct 25th, 2018"

From Tritium Experiments Group
Jump to navigation Jump to search
(Created page with "'''Back to:''' : Main Page : Daily Run Meetings 3:30PM Run Meeting, Counting house meeting room (200C) '''RC:''' Carlos Ayerbe ==Summ...")
 
Line 4: Line 4:
  
 
3:30PM Run Meeting, Counting house meeting room (200C)
 
3:30PM Run Meeting, Counting house meeting room (200C)
 
  
 
'''RC:''' Carlos Ayerbe
 
'''RC:''' Carlos Ayerbe
Line 11: Line 10:
  
 
'''Accelerator'''
 
'''Accelerator'''
 +
 +
- beam studies <br />
 +
- tune beam ~20:00-01:00 <br />
 +
- Phase Studies 2:00 -...
  
 
'''Swing shift'''
 
'''Swing shift'''
 +
 +
- elastics runs from tune beam
  
 
'''Owl shift'''  
 
'''Owl shift'''  
 +
 +
- finish elastics <br />
 +
- LQ3 quench <br />
  
 
'''Day shift'''
 
'''Day shift'''
  
 +
- no beam <br />
 +
- controlled access <br />
 +
- Jessie, Jack and Heidi entered to check LQ3 issue.
  
  
 
==Plan:==
 
==Plan:==
  
===Slides===
+
- expected beam at Swing shift.
 +
 
 +
 
 +
==Slides/Links==
 +
 
 +
MCC scheduling Whiteboard: http://accboard.acc.jlab.org/
  
 
Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/
 
Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/

Revision as of 12:10, 25 October 2018

Back to:

Main Page
Daily Run Meetings

3:30PM Run Meeting, Counting house meeting room (200C)

RC: Carlos Ayerbe

Summary of past 24h:

Accelerator

- beam studies
- tune beam ~20:00-01:00
- Phase Studies 2:00 -...

Swing shift

- elastics runs from tune beam

Owl shift

- finish elastics
- LQ3 quench

Day shift

- no beam
- controlled access
- Jessie, Jack and Heidi entered to check LQ3 issue.


Plan:

- expected beam at Swing shift.


Slides/Links

MCC scheduling Whiteboard: http://accboard.acc.jlab.org/

Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/

BlueJeans connection info:

To join the Meeting: https://bluejeans.com/372278653