Line 22: Line 22:
  
 
- finish elastics <br />
 
- finish elastics <br />
- LQ3 quench <br />
+
- LQ3 quench (~1:30)<br />
  
 
'''Day shift'''
 
'''Day shift'''
  
- no beam <br />
+
- no beam (phaser studies)<br />
- controlled access <br />
+
- controlled access (~8:000 <br />
 
- Jessie, Jack and Heidi entered to check LQ3 issue.<br />
 
- Jessie, Jack and Heidi entered to check LQ3 issue.<br />
- Left arm restored. Right arm is powered (Dipole) low current (100 A) just for investigating its behaviour.  <br />
+
- Left arm restored. Right arm is powered (Dipole) low current (100 A) just to investigate its behaviour.  <br />
 
- ~14:30 Hall in beam permit<br />
 
- ~14:30 Hall in beam permit<br />
  

Revision as of 13:46, 25 October 2018

Back to:

Main Page
Daily Run Meetings

3:30PM Run Meeting, Counting house meeting room (200C)

RC: Carlos Ayerbe

Summary of past 24h:

Accelerator

- beam studies
- tune beam ~20:00-01:00
- Phase Studies 2:00 -...

Swing shift

- elastics runs from tune beam

Owl shift

- finish elastics
- LQ3 quench (~1:30)

Day shift

- no beam (phaser studies)
- controlled access (~8:000
- Jessie, Jack and Heidi entered to check LQ3 issue.
- Left arm restored. Right arm is powered (Dipole) low current (100 A) just to investigate its behaviour.
- ~14:30 Hall in beam permit

Plan:

- expected beam at Swing shift.


Slides/Links