Difference between revisions of "Run Meeting: Oct 25th, 2018"
Jump to navigation
Jump to search
Line 22: | Line 22: | ||
- finish elastics <br /> | - finish elastics <br /> | ||
− | - LQ3 quench <br /> | + | - LQ3 quench (~1:30)<br /> |
'''Day shift''' | '''Day shift''' | ||
− | - no beam <br /> | + | - no beam (phaser studies)<br /> |
− | - controlled access <br /> | + | - controlled access (~8:000 <br /> |
- Jessie, Jack and Heidi entered to check LQ3 issue.<br /> | - Jessie, Jack and Heidi entered to check LQ3 issue.<br /> | ||
− | - Left arm restored. Right arm is powered (Dipole) low current (100 A) just | + | - Left arm restored. Right arm is powered (Dipole) low current (100 A) just to investigate its behaviour. <br /> |
- ~14:30 Hall in beam permit<br /> | - ~14:30 Hall in beam permit<br /> | ||
Revision as of 13:46, 25 October 2018
Back to:
3:30PM Run Meeting, Counting house meeting room (200C)
RC: Carlos Ayerbe
Summary of past 24h:
Accelerator
- beam studies
- tune beam ~20:00-01:00
- Phase Studies 2:00 -...
Swing shift
- elastics runs from tune beam
Owl shift
- finish elastics
- LQ3 quench (~1:30)
Day shift
- no beam (phaser studies)
- controlled access (~8:000
- Jessie, Jack and Heidi entered to check LQ3 issue.
- Left arm restored. Right arm is powered (Dipole) low current (100 A) just to investigate its behaviour.
- ~14:30 Hall in beam permit
Plan:
- expected beam at Swing shift.
Slides/Links
MCC scheduling Whiteboard: http://accboard.acc.jlab.org/
Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/
BlueJeans connection info:
To join the Meeting: https://bluejeans.com/372278653