Difference between revisions of "Run Meeting: Nov 9th, 2018"

From Tritium Experiments Group
Jump to navigation Jump to search
 
(8 intermediate revisions by the same user not shown)
Line 7: Line 7:
  
 
'''RC:''' Jason Bane
 
'''RC:''' Jason Bane
 +
 +
==News from the 8AM meeting==
 +
*Beam studies and Recovery have switched
 +
*A tentative request for a controlled access to start around 9 on Monday during recovery
 +
*The Hall will be required to be locked up on Tuesday. MCC may need to send beam into the Hall to reach their power threshold for the test plan.
 +
  
 
==Summary of past 24h:==
 
==Summary of past 24h:==
News from the 8AM meeting:
+
*Great beam ~76% Beam on Target for Owl shift, 80% for last night's swing shift 76% for yesterday Day.
-Beam studies and Recovery have switched,
+
*A small shift in time S2 FADC TDC PMT 6 -https://logbooks.jlab.org/entry/3623194
-A tentative request for a controlled access to start around 9 on Monday during recovery
+
**Old firmware might be the cause, a shift of 4ns https://logbooks.jlab.org/entry/3623252
-The Hall will be required to be locked up on Tuesday. MCC may need to send beam into the Hall to reach their power threshold for the test plan.
+
* ~15:10 A Magnet in the North LINAC tripped, at least several minutes to recover. https://logbooks.jlab.org/entry/3623588
 
 
Summary for last 24 hours.
 
-Great beam ~76% Beam on Target for Owl shift, 80% for last night's swing shift 76% for yesterday Day.
 
- A small shift in time S2 FADC TDC PMT 6 -https://logbooks.jlab.org/entry/3623194
 
-Old firmware might be the cause, shift is 4ns https://logbooks.jlab.org/entry/3623252
 
  
 
==Slides/Links==
 
==Slides/Links==
Line 26: Line 27:
  
 
Tritium wiki page: https://wiki.jlab.org/tegwiki/index.php/Main_Page
 
Tritium wiki page: https://wiki.jlab.org/tegwiki/index.php/Main_Page
 +
 +
Shift Schedule https://misportal.jlab.org/mis/physics/shiftSchedule/?experimentRunId=HALLA-FALL2018
  
 
= Bluejeans connection information =
 
= Bluejeans connection information =

Latest revision as of 15:23, 9 November 2018

Back to:

Main Page
Daily Run Meetings

3:30PM Run Meeting, Counting house meeting room (200C)

RC: Jason Bane

News from the 8AM meeting

  • Beam studies and Recovery have switched
  • A tentative request for a controlled access to start around 9 on Monday during recovery
  • The Hall will be required to be locked up on Tuesday. MCC may need to send beam into the Hall to reach their power threshold for the test plan.


Summary of past 24h:

Slides/Links

MCC scheduling Whiteboard: http://accboard.acc.jlab.org/

Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/

Tritium wiki page: https://wiki.jlab.org/tegwiki/index.php/Main_Page

Shift Schedule https://misportal.jlab.org/mis/physics/shiftSchedule/?experimentRunId=HALLA-FALL2018

Bluejeans connection information

To join the Meeting: https://bluejeans.com/256205934

To join via Room System: Video Conferencing System: bjn.vc -or-199.48.152.152 Meeting ID : 256205934

To join via phone : 1) Dial:

  +1.408.740.7256 (United States)
  +1.888.240.2560 (US Toll Free)
  +1.408.317.9253 (Alternate number)
  (see all numbers - http://bluejeans.com/numbers)

2) Enter Conference ID : 256205934