'''RC:''' Jason Bane | '''RC:''' Jason Bane | ||
− | == | + | ==News from the 8AM meeting== |
− | News from the 8AM meeting | + | *Beam studies and Recovery have switched |
− | Beam studies and Recovery have switched | + | *A tentative request for a controlled access to start around 9 on Monday during recovery |
− | A tentative request for a controlled access to start around 9 on Monday during recovery | + | *The Hall will be required to be locked up on Tuesday. MCC may need to send beam into the Hall to reach their power threshold for the test plan. |
− | The Hall will be required to be locked up on Tuesday. MCC may need to send beam into the Hall to reach their power threshold for the test plan. | ||
− | Summary | + | ==Summary of past 24h:== |
− | Great beam ~76% Beam on Target for Owl shift, 80% for last night's swing shift 76% for yesterday Day. | + | *Great beam ~76% Beam on Target for Owl shift, 80% for last night's swing shift 76% for yesterday Day. |
− | A small shift in time S2 FADC TDC PMT 6 -https://logbooks.jlab.org/entry/3623194 | + | *A small shift in time S2 FADC TDC PMT 6 -https://logbooks.jlab.org/entry/3623194 |
− | Old firmware might be the cause, a shift of 4ns https://logbooks.jlab.org/entry/3623252 | + | **Old firmware might be the cause, a shift of 4ns https://logbooks.jlab.org/entry/3623252 |
+ | * ~15:10 A Magnet in the North LINAC tripped, at least several minutes to recover. https://logbooks.jlab.org/entry/3623588 | ||
==Slides/Links== | ==Slides/Links== | ||
Line 27: | Line 27: | ||
Tritium wiki page: https://wiki.jlab.org/tegwiki/index.php/Main_Page | Tritium wiki page: https://wiki.jlab.org/tegwiki/index.php/Main_Page | ||
+ | |||
+ | Shift Schedule https://misportal.jlab.org/mis/physics/shiftSchedule/?experimentRunId=HALLA-FALL2018 | ||
= Bluejeans connection information = | = Bluejeans connection information = |
Latest revision as of 15:23, 9 November 2018
Back to:
3:30PM Run Meeting, Counting house meeting room (200C)
RC: Jason Bane
News from the 8AM meeting
- Beam studies and Recovery have switched
- A tentative request for a controlled access to start around 9 on Monday during recovery
- The Hall will be required to be locked up on Tuesday. MCC may need to send beam into the Hall to reach their power threshold for the test plan.
Summary of past 24h:
- Great beam ~76% Beam on Target for Owl shift, 80% for last night's swing shift 76% for yesterday Day.
- A small shift in time S2 FADC TDC PMT 6 -https://logbooks.jlab.org/entry/3623194
- Old firmware might be the cause, a shift of 4ns https://logbooks.jlab.org/entry/3623252
- ~15:10 A Magnet in the North LINAC tripped, at least several minutes to recover. https://logbooks.jlab.org/entry/3623588
Slides/Links
MCC scheduling Whiteboard: http://accboard.acc.jlab.org/
Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/
Tritium wiki page: https://wiki.jlab.org/tegwiki/index.php/Main_Page
Shift Schedule https://misportal.jlab.org/mis/physics/shiftSchedule/?experimentRunId=HALLA-FALL2018
Bluejeans connection information
To join the Meeting: https://bluejeans.com/256205934
To join via Room System: Video Conferencing System: bjn.vc -or-199.48.152.152 Meeting ID : 256205934
To join via phone : 1) Dial:
+1.408.740.7256 (United States) +1.888.240.2560 (US Toll Free) +1.408.317.9253 (Alternate number) (see all numbers - http://bluejeans.com/numbers)
2) Enter Conference ID : 256205934