Difference between revisions of "HYP-meeting 20220602"

From Tritium Experiments Group
Jump to navigation Jump to search
Line 13: Line 13:
  
 
* Channel was converted into NPE.
 
* Channel was converted into NPE.
** ADC sum of Two PMTs <br> &rarr; NPE ~ 9 which is consistent with the results obtained a few years ago.
+
** ADC sum of two PMTs <br> &rarr; NPE ~ 9 which is consistent with the results obtained a few years ago.
  
 
==Detector commissioning==
 
==Detector commissioning==

Revision as of 22:34, 1 June 2022

Information

  • 9:30-11:20 on Jun 02, 2022 JST (8:30-10:20 on Jun 01, 2022 EDT)
  • Bishnu (Hampton Univ.), Toshi (Kyoto Univ.)


Discussion

AC commissioning

  • TDC cut for scintillators
    • Current condition: "TDC cut on each TDC → TOF"
      TG suggested to apply only TOF cut.
  • We found that an ADC of PMTs of scintillators has only pedestal
    → will be checked.
    • Note that the trigger condition is 2 hits out of 4 PMTs.
      → That's why there are pedestals in all ADCs of scintillators.
  • Channel was converted into NPE.
    • ADC sum of two PMTs
      → NPE ~ 9 which is consistent with the results obtained a few years ago.

Detector commissioning