Difference between revisions of "HYP-meeting 20220602"
Jump to navigation
Jump to search
Line 13: | Line 13: | ||
* Channel was converted into NPE. | * Channel was converted into NPE. | ||
− | ** ADC sum of two PMTs <br> → NPE ~ 9 which is consistent with the results obtained a few years ago. | + | ** ADC sum of two PMTs <br> → NPE ~ 9 which is consistent with the results obtained a few years ago. <br> [[File:Plot 20220602.PNG |500px]] |
==Detector commissioning== | ==Detector commissioning== |
Revision as of 22:37, 1 June 2022
Information
- 9:30-11:20 on Jun 02, 2022 JST (8:30-10:20 on Jun 01, 2022 EDT)
- Bishnu (Hampton Univ.), Toshi (Kyoto Univ.)
Discussion
AC commissioning
- TDC cut for scintillators
- Current condition: "TDC cut on each TDC → TOF"
TG suggested to apply only TOF cut.
- Current condition: "TDC cut on each TDC → TOF"
- We found that an ADC of PMTs of scintillators has only pedestal
→ will be checked.- Note that the trigger condition is 2 hits out of 4 PMTs.
→ That's why there are pedestals in all ADCs of scintillators.
- Note that the trigger condition is 2 hits out of 4 PMTs.
- Channel was converted into NPE.