Difference between revisions of "Run Meeting: February 7th, 2018"
Jump to navigation
Jump to search
(5 intermediate revisions by the same user not shown) | |||
Line 9: | Line 9: | ||
===Slides=== | ===Slides=== | ||
* Evan [https://hallaweb.jlab.org/wiki/index.php/Analysis Analysis Coordination Discussion] | * Evan [https://hallaweb.jlab.org/wiki/index.php/Analysis Analysis Coordination Discussion] | ||
+ | * Marco/Hanjie: Events with warnings from F1TDC [[file:F1warnings1861.png|200px]] | ||
=== Information for remote connection === | === Information for remote connection === |
Latest revision as of 15:50, 7 February 2018
Back to Main Page
4:00PM Run Meeting, Counting house meeting room (200C)
After recovering from the ESR trip yesterday at around 9PM, we have taken a nicely stable beam (reduced trip rates) since Hall C is still down. We are now running the highest xB kinematics planned for the experiment: kin15 for L-HRS and kin16 for R-HRS.
Please keep monitoring all aspects of the data taken and detector conditions. Share your findings in the meeting by posting slides on the wiki, so we can discuss:
Slides
- Evan Analysis Coordination Discussion
- Marco/Hanjie: Events with warnings from F1TDC
Information for remote connection
BlueJeans connection info:
To join the Meeting: https://bluejeans.com/372278653
To join via Browser: https://bluejeans.com/372278653/browser