Difference between revisions of "Run Meeting: February 20th, 2018"

From Tritium Experiments Group
Jump to navigation Jump to search
 
Line 7: Line 7:
 
The beam came back yesterday around 6:00 pm, and we got back to production around 8pm. Unser was down, unnoticed, most of the time. Hopefully data are recoverable, but will require extra analysis work.
 
The beam came back yesterday around 6:00 pm, and we got back to production around 8pm. Unser was down, unnoticed, most of the time. Hopefully data are recoverable, but will require extra analysis work.
  
Hall has been brought to controlled access to swap the right Q1 power supply. Hopefully that should be dome *today*. Unser will also be looked at.
+
Hall has been brought to controlled access to swap the right Q1 power supply. That might not happen by the end of the day, in which event we will have to go back again tomorrow.  
 +
Unser issue has been addressed (https://logbooks.jlab.org/entry/3535143).
  
 
Plan:  
 
Plan:  
Go back to production for Kin 15 and Kin 16 once the right Q1 is back.
+
Go back to production for Kin 15; also take data with right HRS (even with Q1 down).
  
  

Latest revision as of 15:29, 20 February 2018

Back to Main Page Daily_Run_Meetings

4:00PM Run Meeting, Counting house meeting room (200C)

Summary of past 24h:

The beam came back yesterday around 6:00 pm, and we got back to production around 8pm. Unser was down, unnoticed, most of the time. Hopefully data are recoverable, but will require extra analysis work.

Hall has been brought to controlled access to swap the right Q1 power supply. That might not happen by the end of the day, in which event we will have to go back again tomorrow. Unser issue has been addressed (https://logbooks.jlab.org/entry/3535143).

Plan: Go back to production for Kin 15; also take data with right HRS (even with Q1 down).