Difference between revisions of "Run Meeting: March 5th, 2018"
(Created page with "Back to Main Page Daily_Run_Meetings 4:00PM Run Meeting, Counting house meeting room (200C) Summary of past 24h: Plan: ===Slides=== BlueJeans connecti...") |
(→Slides) |
||
(21 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
− | Back to [[Main_Page|Main Page]] [[Daily_Run_Meetings]] | + | '''Back to:''' |
+ | : [[Main_Page|Main Page]] | ||
+ | : [[Daily_Run_Meetings|Daily Run Meetings]] | ||
4:00PM Run Meeting, Counting house meeting room (200C) | 4:00PM Run Meeting, Counting house meeting room (200C) | ||
− | |||
+ | '''RC:''' Carlos Ayerbe | ||
− | Plan: | + | ==Summary of past 72h:== |
+ | |||
+ | '''Last Accelerator News''' | ||
+ | : Monday 13:40 Accelerator (and most of components of site) down. it is not expected to be total operative until Tuesday March 06 (best guess). | ||
+ | |||
+ | <span style=color:blue>'''Friday March 2nd'''</span> | ||
+ | |||
+ | '''Swing shift''' | ||
+ | : data production | ||
+ | |||
+ | <span style=color:blue>'''Saturday March 3rd'''</span> | ||
+ | |||
+ | '''Owl shift''' | ||
+ | : data production | ||
+ | : 00:50 beam off ~1.5h due HPA water problem | ||
+ | : Due to a misunderstanding in the crew, two runs with H2 were taken instead of He3. | ||
+ | |||
+ | '''Day shift''' | ||
+ | : data production | ||
+ | : 09:27 Beam to the Hall off ~1.5h due to Beamstopper A-chain dropped ---> https://logbooks.jlab.org/entry/3541990 | ||
+ | |||
+ | '''Swing shift''' | ||
+ | : data production | ||
+ | : 19:50 Raster X power off ---> https://logbooks.jlab.org/entry/3542196 | ||
+ | : 20:40 Bill Gunning enter under control access to repair. 24V power supply replaced ---> https://logbooks.jlab.org/entry/3542226 | ||
+ | :: ~2h without production. | ||
+ | |||
+ | <span style=color:blue>'''Sunday March 4th'''</span> | ||
+ | |||
+ | This day we dedicated to take H3 and He3 data in exclusive until obtain ~30k good electrons at each target. | ||
+ | |||
+ | '''Owl shift''' | ||
+ | : data production | ||
+ | |||
+ | '''Day shift''' | ||
+ | : data production | ||
+ | |||
+ | '''Swing shift''' | ||
+ | : data production | ||
+ | : Beam quality degrading along the shift. | ||
+ | |||
+ | [[File:Snapshot 1.png]] | ||
+ | |||
+ | : 21:40 1L24 SEL Quenches and 2L09 dropped HV. Beam off for 3h. | ||
+ | :: ---> https://logbooks.jlab.org/entry/3542772 | ||
+ | :: ---> https://logbooks.jlab.org/entry/3542778 | ||
+ | |||
+ | <span style=color:blue>'''Monday March 5th'''</span> | ||
+ | |||
+ | '''Owl shift''' | ||
+ | |||
+ | : data production | ||
+ | :: Reached the 30k goal | ||
+ | |||
+ | |||
+ | '''Day shift''' | ||
+ | |||
+ | Change of plans!!! | ||
+ | |||
+ | All the time schedule is moved one hour late in order to allow Hall C finish a kinematic point before change polarity with control access. | ||
+ | |||
+ | Hall A and B entered in controlled access early (9:00) so we didn't run parasitic runs. | ||
+ | |||
+ | : 9:00 Beam Studies <span style=color:red>(+1h)</span> | ||
+ | :: Parasitic data <span style=color:red>(No Hall A)</span> | ||
+ | : 11:00 Controlled Access <span style=color:red>(RadCon requested at 9:00)</span> | ||
+ | :: LHRS Polarity changed | ||
+ | :: Vacuum minor inspection | ||
+ | :: Walk-through | ||
+ | |||
+ | 13:39 Accelerator site power outage (A LOT OF ALARMS!!). Target temperature ~50K, Dave Meekens on site. | ||
+ | |||
+ | ==PLAN== | ||
+ | |||
+ | : LHRS positrons data | ||
+ | : RHRS data production | ||
+ | |||
+ | |||
+ | <span style=color:red>'''DATA Status'''</span> | ||
+ | |||
+ | Round IX. Column 27/(24+4). | ||
+ | |||
+ | Good Electrons | ||
+ | LHRS: | ||
+ | He3: 30.3k; H3: 30.7k; D2: 29k | ||
+ | |||
+ | RHRS: | ||
+ | He3: 37.4k; H3: 16.6k; D2: 15.6k | ||
+ | |||
+ | ==Plan:== | ||
+ | |||
+ | :-Changing LHRS polarity | ||
+ | :-measuring positrons (LHRS) | ||
+ | :-Normal running RHRS | ||
+ | |||
+ | Total: two shifts. | ||
+ | |||
+ | |||
+ | <span style=color:red>'''EXTRA:'''</span> | ||
+ | |||
+ | ;Tuesday RF Recovery | ||
+ | |||
+ | :Start 8:30 | ||
+ | :Ends 12:30 | ||
===Slides=== | ===Slides=== | ||
+ | |||
+ | * BCM class additions [https://wiki.jlab.org/tegwiki/images/5/51/BCMclass_bq.pdf slides] (Bane) | ||
+ | * shujie [https://wiki.jlab.org/tegwiki/index.php/File:Target-density.pdf target density simulation from Silviu] | ||
+ | Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/ | ||
BlueJeans connection info: | BlueJeans connection info: |
Latest revision as of 15:56, 5 March 2018
Back to:
4:00PM Run Meeting, Counting house meeting room (200C)
RC: Carlos Ayerbe
Summary of past 72h:
Last Accelerator News
- Monday 13:40 Accelerator (and most of components of site) down. it is not expected to be total operative until Tuesday March 06 (best guess).
Friday March 2nd
Swing shift
- data production
Saturday March 3rd
Owl shift
- data production
- 00:50 beam off ~1.5h due HPA water problem
- Due to a misunderstanding in the crew, two runs with H2 were taken instead of He3.
Day shift
- data production
- 09:27 Beam to the Hall off ~1.5h due to Beamstopper A-chain dropped ---> https://logbooks.jlab.org/entry/3541990
Swing shift
- data production
- 19:50 Raster X power off ---> https://logbooks.jlab.org/entry/3542196
- 20:40 Bill Gunning enter under control access to repair. 24V power supply replaced ---> https://logbooks.jlab.org/entry/3542226
- ~2h without production.
Sunday March 4th
This day we dedicated to take H3 and He3 data in exclusive until obtain ~30k good electrons at each target.
Owl shift
- data production
Day shift
- data production
Swing shift
- data production
- Beam quality degrading along the shift.
- 21:40 1L24 SEL Quenches and 2L09 dropped HV. Beam off for 3h.
Monday March 5th
Owl shift
- data production
- Reached the 30k goal
Day shift
Change of plans!!!
All the time schedule is moved one hour late in order to allow Hall C finish a kinematic point before change polarity with control access.
Hall A and B entered in controlled access early (9:00) so we didn't run parasitic runs.
- 9:00 Beam Studies (+1h)
- Parasitic data (No Hall A)
- 11:00 Controlled Access (RadCon requested at 9:00)
- LHRS Polarity changed
- Vacuum minor inspection
- Walk-through
13:39 Accelerator site power outage (A LOT OF ALARMS!!). Target temperature ~50K, Dave Meekens on site.
PLAN
- LHRS positrons data
- RHRS data production
DATA Status
Round IX. Column 27/(24+4).
Good Electrons LHRS: He3: 30.3k; H3: 30.7k; D2: 29k
RHRS: He3: 37.4k; H3: 16.6k; D2: 15.6k
Plan:
- -Changing LHRS polarity
- -measuring positrons (LHRS)
- -Normal running RHRS
Total: two shifts.
EXTRA:
- Tuesday RF Recovery
- Start 8:30
- Ends 12:30
Slides
- BCM class additions slides (Bane)
- shujie target density simulation from Silviu
Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/
BlueJeans connection info:
To join the Meeting: https://bluejeans.com/372278653