Difference between revisions of "Run Meeting: March 6th, 2018"

From Tritium Experiments Group
Jump to navigation Jump to search
(Created page with "Back to Main Page Daily_Run_Meetings 4:00PM Run Meeting, Counting house meeting room (200C) Summary of past 24h: Plan: ===Slides=== BlueJeans connecti...")
 
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
Back to [[Main_Page|Main Page]] [[Daily_Run_Meetings]]
+
'''Back to:'''
 +
: [[Main_Page|Main Page]]
 +
: [[Daily_Run_Meetings|Daily Run Meetings]]
  
 
4:00PM Run Meeting, Counting house meeting room (200C)
 
4:00PM Run Meeting, Counting house meeting room (200C)
  
Summary of past 24h:
 
  
 +
'''RC:''' Carlos Ayerbe
  
Plan:  
+
==Summary of past 24h:==
 +
<span style=color:red>IS ANYBODY NOT AWARE?</span>
 +
 
 +
Just in case, accelerator is down.
 +
 
 +
Min time: 3 days (but 1 pass)
 +
Estimated Max time: 2 weeks
 +
Worst (but best) scenario: 3 weeks
 +
 
 +
==Plan:==
 +
 
 +
We are in restricted access. None of the magnets should be ramped up. There is a small margin to do it, but Jessie should be consulted.
 +
 
 +
IF (big if) we get beam, it is expected for Friday.
 +
 
 +
TOMORROW:
 +
 
 +
:Ole will do some important computer maintenance at the counting house between 6am and approximately 9am
 +
 
 +
Note from Ole:
 +
" To do the switch, we have to log everyone out of all the counting house machines (adaq1/2, aonl1-4, adaqsc, compton). The machines will not have to be rebooted if all goes well, but some might."
 +
 
 +
:Bob will install a new UPS for the network.
 +
 
 +
: I'd suggest Shujie to come to the morning early and midday MCC meeting.
  
 
===Slides===
 
===Slides===

Latest revision as of 15:51, 6 March 2018

Back to:

Main Page
Daily Run Meetings

4:00PM Run Meeting, Counting house meeting room (200C)


RC: Carlos Ayerbe

Summary of past 24h:

IS ANYBODY NOT AWARE?

Just in case, accelerator is down.

Min time: 3 days (but 1 pass) Estimated Max time: 2 weeks Worst (but best) scenario: 3 weeks

Plan:

We are in restricted access. None of the magnets should be ramped up. There is a small margin to do it, but Jessie should be consulted.

IF (big if) we get beam, it is expected for Friday.

TOMORROW:

Ole will do some important computer maintenance at the counting house between 6am and approximately 9am

Note from Ole: " To do the switch, we have to log everyone out of all the counting house machines (adaq1/2, aonl1-4, adaqsc, compton). The machines will not have to be rebooted if all goes well, but some might."

Bob will install a new UPS for the network.
I'd suggest Shujie to come to the morning early and midday MCC meeting.

Slides

BlueJeans connection info:

To join the Meeting: https://bluejeans.com/372278653