Difference between revisions of "Run Meeting: March 2nd, 2018"

From Tritium Experiments Group
Jump to navigation Jump to search
 
(6 intermediate revisions by 3 users not shown)
Line 1: Line 1:
Back to [[Main_Page|Main Page]] [[Daily_Run_Meetings]]
+
'''Back to:'''
 +
: [[Main_Page|Main Page]]
 +
: [[Daily_Run_Meetings|Daily Run Meetings]]
  
 
4:00PM Run Meeting, Counting house meeting room (200C)
 
4:00PM Run Meeting, Counting house meeting room (200C)
  
Summary of past 24h:
 
  
 +
'''RC:''' Carlos Ayerbe
  
Plan:  
+
==Summary of past 24h:==
 +
 
 +
'''Accelerator'''
 +
: 7:30 - ARC magnet issues causes the beam to be off. Same problem was reported last Wednesday. ---> https://cebaf.jlab.org/dtm/open-events?event_id=3456
 +
 
 +
'''Swing shift'''
 +
: data production
 +
: ~17:50 beam down ~2h linac bypass ---> https://logbooks.jlab.org/entry/3541009
 +
: ~19:00 CODA corresponding to LHRS crashed and unable to recover by crew. Ole Hansen called. Solution: reboot computer. ---> https://logbooks.jlab.org/entry/3541044
 +
:: Ole Hansen Entry ---> https://logbooks.jlab.org/entry/3541027
 +
:: Bob Michaels Entry ---> https://logbooks.jlab.org/entry/3541453
 +
 
 +
'''Owl shift'''
 +
: data production
 +
: several alarms on the gas shed due to high wind (just annoying) ---> https://logbooks.jlab.org/entry/3541235
 +
: 07:30 beam off (see accelerator note). 
 +
 
 +
'''Day shift'''
 +
: Beam off for several hours.
 +
: Controlled Access <span style=color:red>(CANCELLED)</span>
 +
::Douglas walk-through
 +
::Vacuum system small inspection
 +
: Tuning beam ~14:00
 +
 
 +
 
 +
 
 +
<span style=color:red>'''DATA Status'''</span>
 +
 
 +
Round VIII. Column 24/24. 1st H3 Run.
 +
 
 +
==Plan:==
 +
 
 +
Continue taking data and extend the columns
 +
 
 +
<span style=color:red>'''EXTRA:'''</span>
 +
;Monday Beam Studies
 +
 
 +
:Start 9:00 am
 +
 
 +
*opportunistic beam.
 +
**FFB (2h)
 +
 
 +
*Beam OFF
 +
** 'eta' tool devel (2h)
 +
**Optics (3h)
 +
 
 +
:Beam back 16:00-17:00.
 +
 
 +
;Tuesday RF Recovery
 +
 
 +
:Start 8:30
 +
:Ends 12:30
  
 
===Slides===
 
===Slides===
  
* Beam Quality/trip cut [https://wiki.jlab.org/tegwiki/images/e/e9/Beam_quailty.pdf (Slides)]
+
*[https://hallaweb.jlab.org/wiki/images/9/96/Pass1Overview.pdf Pass 1 Overview] (Evan)
 +
*[https://wiki.jlab.org/tegwiki/images/e/e9/Beam_quailty.pdf Beam quality cut] (Bane)
  
 +
Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/
  
 
BlueJeans connection info:
 
BlueJeans connection info:

Latest revision as of 15:11, 2 March 2018

Back to:

Main Page
Daily Run Meetings

4:00PM Run Meeting, Counting house meeting room (200C)


RC: Carlos Ayerbe

Summary of past 24h:

Accelerator

7:30 - ARC magnet issues causes the beam to be off. Same problem was reported last Wednesday. ---> https://cebaf.jlab.org/dtm/open-events?event_id=3456

Swing shift

data production
~17:50 beam down ~2h linac bypass ---> https://logbooks.jlab.org/entry/3541009
~19:00 CODA corresponding to LHRS crashed and unable to recover by crew. Ole Hansen called. Solution: reboot computer. ---> https://logbooks.jlab.org/entry/3541044
Ole Hansen Entry ---> https://logbooks.jlab.org/entry/3541027
Bob Michaels Entry ---> https://logbooks.jlab.org/entry/3541453

Owl shift

data production
several alarms on the gas shed due to high wind (just annoying) ---> https://logbooks.jlab.org/entry/3541235
07:30 beam off (see accelerator note).

Day shift

Beam off for several hours.
Controlled Access (CANCELLED)
Douglas walk-through
Vacuum system small inspection
Tuning beam ~14:00


DATA Status

Round VIII. Column 24/24. 1st H3 Run.

Plan:

Continue taking data and extend the columns

EXTRA:

Monday Beam Studies
Start 9:00 am
  • opportunistic beam.
    • FFB (2h)
  • Beam OFF
    • 'eta' tool devel (2h)
    • Optics (3h)
Beam back 16:00-17:00.
Tuesday RF Recovery
Start 8:30
Ends 12:30

Slides

Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/

BlueJeans connection info:

To join the Meeting: https://bluejeans.com/372278653