− | '''Accelerator''' | + | '''Last Accelerator News''' |
− | : | + | : Monday 13:40 Accelerator (and most of components of site) down. it is not expected to be total operative until Tuesday March 06 (best guess). |
<span style=color:blue>'''Friday March 2nd'''</span> | <span style=color:blue>'''Friday March 2nd'''</span> | ||
Line 22: | Line 22: | ||
'''Owl shift''' | '''Owl shift''' | ||
: data production | : data production | ||
+ | : 00:50 beam off ~1.5h due HPA water problem | ||
: Due to a misunderstanding in the crew, two runs with H2 were taken instead of He3. | : Due to a misunderstanding in the crew, two runs with H2 were taken instead of He3. | ||
'''Day shift''' | '''Day shift''' | ||
: data production | : data production | ||
− | : 09:27 Beam to the Hall off due to Beamstopper A-chain dropped ---> https://logbooks.jlab.org/entry/3541990 | + | : 09:27 Beam to the Hall off ~1.5h due to Beamstopper A-chain dropped ---> https://logbooks.jlab.org/entry/3541990 |
− | |||
'''Swing shift''' | '''Swing shift''' | ||
: data production | : data production | ||
+ | : 19:50 Raster X power off ---> https://logbooks.jlab.org/entry/3542196 | ||
+ | : 20:40 Bill Gunning enter under control access to repair. 24V power supply replaced ---> https://logbooks.jlab.org/entry/3542226 | ||
+ | :: ~2h without production. | ||
<span style=color:blue>'''Sunday March 4th'''</span> | <span style=color:blue>'''Sunday March 4th'''</span> | ||
+ | |||
+ | This day we dedicated to take H3 and He3 data in exclusive until obtain ~30k good electrons at each target. | ||
'''Owl shift''' | '''Owl shift''' | ||
Line 41: | Line 46: | ||
'''Swing shift''' | '''Swing shift''' | ||
− | : data production | + | : data production |
+ | : Beam quality degrading along the shift. | ||
+ | |||
+ | [[File:Snapshot 1.png]] | ||
+ | |||
+ | : 21:40 1L24 SEL Quenches and 2L09 dropped HV. Beam off for 3h. | ||
+ | :: ---> https://logbooks.jlab.org/entry/3542772 | ||
+ | :: ---> https://logbooks.jlab.org/entry/3542778 | ||
− | <span style=color:blue>''' | + | <span style=color:blue>'''Monday March 5th'''</span> |
'''Owl shift''' | '''Owl shift''' | ||
− | : data production | + | |
+ | : data production | ||
+ | :: Reached the 30k goal | ||
+ | |||
'''Day shift''' | '''Day shift''' | ||
− | |||
+ | Change of plans!!! | ||
+ | |||
+ | All the time schedule is moved one hour late in order to allow Hall C finish a kinematic point before change polarity with control access. | ||
+ | |||
+ | Hall A and B entered in controlled access early (9:00) so we didn't run parasitic runs. | ||
+ | |||
+ | : 9:00 Beam Studies <span style=color:red>(+1h)</span> | ||
+ | :: Parasitic data <span style=color:red>(No Hall A)</span> | ||
+ | : 11:00 Controlled Access <span style=color:red>(RadCon requested at 9:00)</span> | ||
+ | :: LHRS Polarity changed | ||
+ | :: Vacuum minor inspection | ||
+ | :: Walk-through | ||
+ | 13:39 Accelerator site power outage (A LOT OF ALARMS!!). Target temperature ~50K, Dave Meekens on site. | ||
+ | ==PLAN== | ||
+ | : LHRS positrons data | ||
+ | : RHRS data production | ||
<span style=color:red>'''DATA Status'''</span> | <span style=color:red>'''DATA Status'''</span> | ||
− | Round IX. Column | + | Round IX. Column 27/(24+4). |
+ | |||
+ | Good Electrons | ||
+ | LHRS: | ||
+ | He3: 30.3k; H3: 30.7k; D2: 29k | ||
+ | |||
+ | RHRS: | ||
+ | He3: 37.4k; H3: 16.6k; D2: 15.6k | ||
==Plan:== | ==Plan:== | ||
− | -Changing LHRS polarity | + | :-Changing LHRS polarity |
− | -measuring positrons (LHRS) | + | :-measuring positrons (LHRS) |
− | -Normal running RHRS | + | :-Normal running RHRS |
Total: two shifts. | Total: two shifts. | ||
Line 70: | Line 107: | ||
<span style=color:red>'''EXTRA:'''</span> | <span style=color:red>'''EXTRA:'''</span> | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
;Tuesday RF Recovery | ;Tuesday RF Recovery | ||
Line 90: | Line 115: | ||
===Slides=== | ===Slides=== | ||
− | *[https:// | + | * BCM class additions [https://wiki.jlab.org/tegwiki/images/5/51/BCMclass_bq.pdf slides] (Bane) |
− | *[https://wiki.jlab.org/tegwiki/ | + | * shujie [https://wiki.jlab.org/tegwiki/index.php/File:Target-density.pdf target density simulation from Silviu] |
− | |||
Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/ | Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/ | ||
Latest revision as of 15:56, 5 March 2018
Back to:
4:00PM Run Meeting, Counting house meeting room (200C)
RC: Carlos Ayerbe
Summary of past 72h:
Last Accelerator News
- Monday 13:40 Accelerator (and most of components of site) down. it is not expected to be total operative until Tuesday March 06 (best guess).
Friday March 2nd
Swing shift
- data production
Saturday March 3rd
Owl shift
- data production
- 00:50 beam off ~1.5h due HPA water problem
- Due to a misunderstanding in the crew, two runs with H2 were taken instead of He3.
Day shift
- data production
- 09:27 Beam to the Hall off ~1.5h due to Beamstopper A-chain dropped ---> https://logbooks.jlab.org/entry/3541990
Swing shift
- data production
- 19:50 Raster X power off ---> https://logbooks.jlab.org/entry/3542196
- 20:40 Bill Gunning enter under control access to repair. 24V power supply replaced ---> https://logbooks.jlab.org/entry/3542226
- ~2h without production.
Sunday March 4th
This day we dedicated to take H3 and He3 data in exclusive until obtain ~30k good electrons at each target.
Owl shift
- data production
Day shift
- data production
Swing shift
- data production
- Beam quality degrading along the shift.
- 21:40 1L24 SEL Quenches and 2L09 dropped HV. Beam off for 3h.
Monday March 5th
Owl shift
- data production
- Reached the 30k goal
Day shift
Change of plans!!!
All the time schedule is moved one hour late in order to allow Hall C finish a kinematic point before change polarity with control access.
Hall A and B entered in controlled access early (9:00) so we didn't run parasitic runs.
- 9:00 Beam Studies (+1h)
- Parasitic data (No Hall A)
- 11:00 Controlled Access (RadCon requested at 9:00)
- LHRS Polarity changed
- Vacuum minor inspection
- Walk-through
13:39 Accelerator site power outage (A LOT OF ALARMS!!). Target temperature ~50K, Dave Meekens on site.
PLAN
- LHRS positrons data
- RHRS data production
DATA Status
Round IX. Column 27/(24+4).
Good Electrons LHRS: He3: 30.3k; H3: 30.7k; D2: 29k
RHRS: He3: 37.4k; H3: 16.6k; D2: 15.6k
Plan:
- -Changing LHRS polarity
- -measuring positrons (LHRS)
- -Normal running RHRS
Total: two shifts.
EXTRA:
- Tuesday RF Recovery
- Start 8:30
- Ends 12:30
Slides
- BCM class additions slides (Bane)
- shujie target density simulation from Silviu
Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/
BlueJeans connection info: