Difference between revisions of "Run Meeting: March 5th, 2018"
(→Slides) |
(→Slides) |
||
(3 intermediate revisions by 2 users not shown) | |||
Line 10: | Line 10: | ||
==Summary of past 72h:== | ==Summary of past 72h:== | ||
− | '''Accelerator''' | + | '''Last Accelerator News''' |
− | : | + | : Monday 13:40 Accelerator (and most of components of site) down. it is not expected to be total operative until Tuesday March 06 (best guess). |
<span style=color:blue>'''Friday March 2nd'''</span> | <span style=color:blue>'''Friday March 2nd'''</span> | ||
Line 58: | Line 58: | ||
'''Owl shift''' | '''Owl shift''' | ||
+ | |||
+ | : data production | ||
+ | :: Reached the 30k goal | ||
+ | |||
+ | |||
+ | '''Day shift''' | ||
Change of plans!!! | Change of plans!!! | ||
Line 72: | Line 78: | ||
:: Walk-through | :: Walk-through | ||
− | + | 13:39 Accelerator site power outage (A LOT OF ALARMS!!). Target temperature ~50K, Dave Meekens on site. | |
+ | |||
+ | ==PLAN== | ||
+ | |||
: LHRS positrons data | : LHRS positrons data | ||
: RHRS data production | : RHRS data production | ||
− | |||
− | |||
− | |||
− | |||
Line 110: | Line 115: | ||
===Slides=== | ===Slides=== | ||
− | * BCM | + | * BCM class additions [https://wiki.jlab.org/tegwiki/images/5/51/BCMclass_bq.pdf slides] (Bane) |
− | + | * shujie [https://wiki.jlab.org/tegwiki/index.php/File:Target-density.pdf target density simulation from Silviu] | |
Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/ | Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/ | ||
Latest revision as of 15:56, 5 March 2018
Back to:
4:00PM Run Meeting, Counting house meeting room (200C)
RC: Carlos Ayerbe
Summary of past 72h:
Last Accelerator News
- Monday 13:40 Accelerator (and most of components of site) down. it is not expected to be total operative until Tuesday March 06 (best guess).
Friday March 2nd
Swing shift
- data production
Saturday March 3rd
Owl shift
- data production
- 00:50 beam off ~1.5h due HPA water problem
- Due to a misunderstanding in the crew, two runs with H2 were taken instead of He3.
Day shift
- data production
- 09:27 Beam to the Hall off ~1.5h due to Beamstopper A-chain dropped ---> https://logbooks.jlab.org/entry/3541990
Swing shift
- data production
- 19:50 Raster X power off ---> https://logbooks.jlab.org/entry/3542196
- 20:40 Bill Gunning enter under control access to repair. 24V power supply replaced ---> https://logbooks.jlab.org/entry/3542226
- ~2h without production.
Sunday March 4th
This day we dedicated to take H3 and He3 data in exclusive until obtain ~30k good electrons at each target.
Owl shift
- data production
Day shift
- data production
Swing shift
- data production
- Beam quality degrading along the shift.
- 21:40 1L24 SEL Quenches and 2L09 dropped HV. Beam off for 3h.
Monday March 5th
Owl shift
- data production
- Reached the 30k goal
Day shift
Change of plans!!!
All the time schedule is moved one hour late in order to allow Hall C finish a kinematic point before change polarity with control access.
Hall A and B entered in controlled access early (9:00) so we didn't run parasitic runs.
- 9:00 Beam Studies (+1h)
- Parasitic data (No Hall A)
- 11:00 Controlled Access (RadCon requested at 9:00)
- LHRS Polarity changed
- Vacuum minor inspection
- Walk-through
13:39 Accelerator site power outage (A LOT OF ALARMS!!). Target temperature ~50K, Dave Meekens on site.
PLAN
- LHRS positrons data
- RHRS data production
DATA Status
Round IX. Column 27/(24+4).
Good Electrons LHRS: He3: 30.3k; H3: 30.7k; D2: 29k
RHRS: He3: 37.4k; H3: 16.6k; D2: 15.6k
Plan:
- -Changing LHRS polarity
- -measuring positrons (LHRS)
- -Normal running RHRS
Total: two shifts.
EXTRA:
- Tuesday RF Recovery
- Start 8:30
- Ends 12:30
Slides
- BCM class additions slides (Bane)
- shujie target density simulation from Silviu
Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/
BlueJeans connection info:
To join the Meeting: https://bluejeans.com/372278653