(Created page with "'''Back to:''' : Main Page : Daily Run Meetings 4:00PM Run Meeting, Counting house meeting room (200C) '''RC:''' Shujie Li [https://mi...") |
(→Status) |
||
(One intermediate revision by the same user not shown) | |||
Line 11: | Line 11: | ||
==Status== | ==Status== | ||
*kin13/kin16 production in progress | *kin13/kin16 production in progress | ||
− | * | + | * 5th pass separator tripped a few times. |
− | *BCM/ | + | * Mike took an Unser calibration. Tried BCM calibration near the noon but beam was so trippy, gave up. Will try on Saturday when we have stable beam. |
+ | * Hall A iocs lost connection around 1:50pm, requested an escort access to fix ups. System back online around 2:30pm. | ||
+ | |||
+ | https://logbooks.jlab.org/entry/3555964 | ||
+ | |||
+ | |||
+ | Thanks cryo group (Robert Norton!), Radcon, Jessie, Heidi and Hall A tech team for the fast response! | ||
+ | * Hall B pass change from 3 to 5 | ||
==Slides== | ==Slides== |
Latest revision as of 14:46, 6 April 2018
Back to:
4:00PM Run Meeting, Counting house meeting room (200C)
RC: Shujie Li
Status
- kin13/kin16 production in progress
- 5th pass separator tripped a few times.
- Mike took an Unser calibration. Tried BCM calibration near the noon but beam was so trippy, gave up. Will try on Saturday when we have stable beam.
- Hall A iocs lost connection around 1:50pm, requested an escort access to fix ups. System back online around 2:30pm.
https://logbooks.jlab.org/entry/3555964
Thanks cryo group (Robert Norton!), Radcon, Jessie, Heidi and Hall A tech team for the fast response!
- Hall B pass change from 3 to 5
Slides
BlueJeans connection info:
To join the Meeting: https://bluejeans.com/372278653