Difference between revisions of "Run Meeting: April 20th, 2018"
Jump to navigation
Jump to search
(→e'p) |
(→e'p) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 12: | Line 12: | ||
Smooth data taking during the last 24h. There were only minor beam issues i.e a | Smooth data taking during the last 24h. There were only minor beam issues i.e a | ||
change in the 2nd pass separator phase. | change in the 2nd pass separator phase. | ||
− | |||
− | + | Collected statistics: 2.3 C < charge < 2.4 C on each target at run 100255. | |
+ | |||
+ | Down times: | ||
+ | : injector problem (Gun HV Air Pressure Fault - bad solenoid): ~1h30 total; | ||
+ | : 2pass separator phase drift (~30 minutes) | ||
+ | : adaq1 freezing issue + subsequent DAQ trouble: ~30 minutes down. | ||
==Slides== | ==Slides== |
Latest revision as of 14:59, 20 April 2018
Back to:
4:00PM Run Meeting, Counting house meeting room (200C)
RC: Eric Fuchey
e'p
Smooth data taking during the last 24h. There were only minor beam issues i.e a change in the 2nd pass separator phase.
Collected statistics: 2.3 C < charge < 2.4 C on each target at run 100255.
Down times:
- injector problem (Gun HV Air Pressure Fault - bad solenoid): ~1h30 total;
- 2pass separator phase drift (~30 minutes)
- adaq1 freezing issue + subsequent DAQ trouble: ~30 minutes down.
Slides
BlueJeans connection info:
To join the Meeting: https://bluejeans.com/372278653