Difference between revisions of "Run Meeting: May 3rd, 2018"
Jump to navigation
Jump to search
(Created page) |
m (Spelling mistake) |
||
(One intermediate revision by the same user not shown) | |||
Line 8: | Line 8: | ||
[https://misportal.jlab.org/mis/physics/shiftSchedule/?experimentRunId=TRITON-2017 (shifts)] | [https://misportal.jlab.org/mis/physics/shiftSchedule/?experimentRunId=TRITON-2017 (shifts)] | ||
+ | |||
+ | ==Last 24 hours== | ||
+ | |||
+ | * Massive network failure affecting EVERYTHING | ||
+ | ** We need to double check all of our hardware | ||
+ | ** Pick up with phase-III checkout once beam resumes. | ||
==xB>1== | ==xB>1== | ||
+ | |||
+ | * Phase III checkout | ||
+ | * Abridged run plan? |
Latest revision as of 09:34, 3 May 2018
Back to:
4:00PM Run Meeting, Counting house meeting room (200C)
RC: Axel Schmidt
Last 24 hours
- Massive network failure affecting EVERYTHING
- We need to double check all of our hardware
- Pick up with phase-III checkout once beam resumes.
xB>1
- Phase III checkout
- Abridged run plan?