Difference between revisions of "Run Meeting: Oct 25th, 2018"
(3 intermediate revisions by the same user not shown) | |||
Line 13: | Line 13: | ||
- beam studies <br /> | - beam studies <br /> | ||
- tune beam ~20:00-01:00 <br /> | - tune beam ~20:00-01:00 <br /> | ||
− | - Phase Studies | + | - Phase Studies 02:00 -... |
'''Swing shift''' | '''Swing shift''' | ||
Line 22: | Line 22: | ||
- finish elastics <br /> | - finish elastics <br /> | ||
− | - LQ3 quench <br /> | + | - LQ3 quench (~1:30)<br /> |
'''Day shift''' | '''Day shift''' | ||
− | - no beam <br /> | + | - no beam (phaser studies)<br /> |
− | - controlled access <br /> | + | - controlled access (~08:00) <br /> |
- Jessie, Jack and Heidi entered to check LQ3 issue.<br /> | - Jessie, Jack and Heidi entered to check LQ3 issue.<br /> | ||
− | - Left arm restored. Right arm is powered (Dipole) low current (100 A) just | + | - Left arm restored. Right arm is powered (Dipole) low current (100 A) just to investigate its behaviour. <br /> |
- ~14:30 Hall in beam permit<br /> | - ~14:30 Hall in beam permit<br /> | ||
Line 43: | Line 43: | ||
Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/ | Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/ | ||
− | + | Tritium wiki page: https://wiki.jlab.org/tegwiki/index.php/Main_Page | |
+ | |||
+ | = Bluejeans connection information = | ||
To join the Meeting: | To join the Meeting: | ||
− | https://bluejeans.com/ | + | https://bluejeans.com/256205934 |
+ | |||
+ | To join via Room System: | ||
+ | Video Conferencing System: bjn.vc -or-199.48.152.152 | ||
+ | Meeting ID : 256205934 | ||
+ | |||
+ | To join via phone : | ||
+ | 1) Dial: | ||
+ | +1.408.740.7256 (United States) | ||
+ | +1.888.240.2560 (US Toll Free) | ||
+ | +1.408.317.9253 (Alternate number) | ||
+ | (see all numbers - http://bluejeans.com/numbers) | ||
+ | 2) Enter Conference ID : 256205934 |
Latest revision as of 21:05, 27 October 2018
Back to:
3:30PM Run Meeting, Counting house meeting room (200C)
RC: Carlos Ayerbe
Summary of past 24h:
Accelerator
- beam studies
- tune beam ~20:00-01:00
- Phase Studies 02:00 -...
Swing shift
- elastics runs from tune beam
Owl shift
- finish elastics
- LQ3 quench (~1:30)
Day shift
- no beam (phaser studies)
- controlled access (~08:00)
- Jessie, Jack and Heidi entered to check LQ3 issue.
- Left arm restored. Right arm is powered (Dipole) low current (100 A) just to investigate its behaviour.
- ~14:30 Hall in beam permit
Plan:
- expected beam at Swing shift.
Slides/Links
MCC scheduling Whiteboard: http://accboard.acc.jlab.org/
Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/
Tritium wiki page: https://wiki.jlab.org/tegwiki/index.php/Main_Page
Bluejeans connection information
To join the Meeting: https://bluejeans.com/256205934
To join via Room System: Video Conferencing System: bjn.vc -or-199.48.152.152 Meeting ID : 256205934
To join via phone : 1) Dial:
+1.408.740.7256 (United States) +1.888.240.2560 (US Toll Free) +1.408.317.9253 (Alternate number) (see all numbers - http://bluejeans.com/numbers)
2) Enter Conference ID : 256205934