Difference between revisions of "Run Meeting: Oct 25th, 2018"

From Tritium Experiments Group
Jump to navigation Jump to search
 
(3 intermediate revisions by the same user not shown)
Line 13: Line 13:
 
- beam studies <br />
 
- beam studies <br />
 
- tune beam ~20:00-01:00 <br />
 
- tune beam ~20:00-01:00 <br />
- Phase Studies 2:00 -...
+
- Phase Studies 02:00 -...
  
 
'''Swing shift'''
 
'''Swing shift'''
Line 22: Line 22:
  
 
- finish elastics <br />
 
- finish elastics <br />
- LQ3 quench <br />
+
- LQ3 quench (~1:30)<br />
  
 
'''Day shift'''
 
'''Day shift'''
  
- no beam <br />
+
- no beam (phaser studies)<br />
- controlled access <br />
+
- controlled access (~08:00) <br />
 
- Jessie, Jack and Heidi entered to check LQ3 issue.<br />
 
- Jessie, Jack and Heidi entered to check LQ3 issue.<br />
- Left arm restored. Right arm is powered (Dipole) low current (100 A) just for investigating its behaviour.  <br />
+
- Left arm restored. Right arm is powered (Dipole) low current (100 A) just to investigate its behaviour.  <br />
 
- ~14:30 Hall in beam permit<br />
 
- ~14:30 Hall in beam permit<br />
  
Line 43: Line 43:
 
Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/
 
Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/
  
BlueJeans connection info:
+
Tritium wiki page: https://wiki.jlab.org/tegwiki/index.php/Main_Page
 +
 
 +
= Bluejeans connection information =
  
 
To join the Meeting:
 
To join the Meeting:
https://bluejeans.com/372278653
+
https://bluejeans.com/256205934
 +
 
 +
To join via Room System:
 +
Video Conferencing System: bjn.vc -or-199.48.152.152
 +
Meeting ID : 256205934
 +
 
 +
To join via phone :
 +
1)  Dial:
 +
  +1.408.740.7256 (United States)
 +
  +1.888.240.2560 (US Toll Free)
 +
  +1.408.317.9253 (Alternate number)
 +
  (see all numbers - http://bluejeans.com/numbers)
 +
2)  Enter Conference ID : 256205934

Latest revision as of 21:05, 27 October 2018

Back to:

Main Page
Daily Run Meetings

3:30PM Run Meeting, Counting house meeting room (200C)

RC: Carlos Ayerbe

Summary of past 24h:

Accelerator

- beam studies
- tune beam ~20:00-01:00
- Phase Studies 02:00 -...

Swing shift

- elastics runs from tune beam

Owl shift

- finish elastics
- LQ3 quench (~1:30)

Day shift

- no beam (phaser studies)
- controlled access (~08:00)
- Jessie, Jack and Heidi entered to check LQ3 issue.
- Left arm restored. Right arm is powered (Dipole) low current (100 A) just to investigate its behaviour.
- ~14:30 Hall in beam permit

Plan:

- expected beam at Swing shift.


Slides/Links

MCC scheduling Whiteboard: http://accboard.acc.jlab.org/

Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/

Tritium wiki page: https://wiki.jlab.org/tegwiki/index.php/Main_Page

Bluejeans connection information

To join the Meeting: https://bluejeans.com/256205934

To join via Room System: Video Conferencing System: bjn.vc -or-199.48.152.152 Meeting ID : 256205934

To join via phone : 1) Dial:

  +1.408.740.7256 (United States)
  +1.888.240.2560 (US Toll Free)
  +1.408.317.9253 (Alternate number)
  (see all numbers - http://bluejeans.com/numbers)

2) Enter Conference ID : 256205934