Difference between revisions of "Run Plan From Run Coordinator"

From Tritium Experiments Group
Jump to navigation Jump to search
Line 1: Line 1:
 +
 +
=Dec 15 Day Shift=
 +
*Remove Sieve from LHRS
 +
*Run Dummy with nominal raster at I = 22.5, 15, 10, 5, 2.5 uA  -- 2 million events each (~15 minutes @ 2kHz)
 +
*Run Multifoil with nominal raster at I = 22.5, 15, 10, 5, 2.5 uA  -- 1 million events each (~15 minutes @ 2kHz)
 +
 +
=Other Links=
 +
 
*'''Commissioning timetable''' [https://docs.google.com/spreadsheets/d/1LE0K4jgPMolJvvj33uXu9v-OLi_FKqjZokoChkLLNaA/edit?usp=sharing (google sheet)]  
 
*'''Commissioning timetable''' [https://docs.google.com/spreadsheets/d/1LE0K4jgPMolJvvj33uXu9v-OLi_FKqjZokoChkLLNaA/edit?usp=sharing (google sheet)]  
 
<span>Brief but reflects the exact runplan.</span>
 
<span>Brief but reflects the exact runplan.</span>

Revision as of 10:19, 15 December 2017

Dec 15 Day Shift

  • Remove Sieve from LHRS
  • Run Dummy with nominal raster at I = 22.5, 15, 10, 5, 2.5 uA -- 2 million events each (~15 minutes @ 2kHz)
  • Run Multifoil with nominal raster at I = 22.5, 15, 10, 5, 2.5 uA -- 1 million events each (~15 minutes @ 2kHz)

Other Links

Brief but reflects the exact runplan.


Documentation and details. Could be out-of-date. Please always check with run coordinator and student experts.