Revision as of 17:03, 15 December 2017
Dec 15 Swing Shift
- See WhiteBoard
- Boiling Study: [1]
Dec 15 Day Shift
- Remove Sieve from LHRS
- Run Dummy with nominal raster at I = 22.5, 15, 10, 5, 2.5 uA -- 2 million events each (~15 minutes @ 2kHz)
- FADC threshold check
- Run Multifoil with nominal raster at I = 22.5, 15, 10, 5, 2.5 uA -- 1 million events each (~15 minutes @ 2kHz)
- Access begins at 1pm https://logbooks.jlab.org/entry/3505097
- When gas cell running is approved:
- call RC
- begin target boiling study [2]
Other Links
- Commissioning timetable (google sheet)
Brief but reflects the exact runplan.
- Commissioning How-to (wiki)
Documentation and details. Could be out-of-date. Please always check with run coordinator and student experts.