Difference between revisions of "Target Boiling Study"
Jump to navigation
Jump to search
m |
m |
||
Line 15: | Line 15: | ||
<td>Empty Cell</td> | <td>Empty Cell</td> | ||
<td>22.5uA</td> | <td>22.5uA</td> | ||
− | <td> < | + | <td> 100K Events after cut |VZ|<7.5cm </td> |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
</tr> | </tr> | ||
+ | |||
</table> | </table> | ||
* <b>H2 Target</b> | * <b>H2 Target</b> |
Revision as of 16:50, 15 December 2017
Back to Installation and Commissioning
- E0 = 2.2 GeV, Ep = 2.00 GeV/c, Theta = 17 Degrees, *Raster On* (2.5mmx2mm MCC = 2mmx2mm on target)
- Empty-Cell Target
Run number | Target | Beam Current | Comment |
Empty Cell | 22.5uA | 100K Events after cut |VZ|<7.5cm |
- H2 Target
Run number | Target | Beam Current | Comment |
H2 | 22.5uA | ||
H2 | 15uA | ||
H2 | 10uA | ||
H2 | 5uA | ||
H2 | 2.5uA |
- H3 Target
Run number | Target | Beam Current | Comment |
H3 | 22.5uA | ||
H3 | 15uA | ||
H3 | 10uA | ||
H3 | 5uA | ||
H3 | 2.5uA |
- He3 Target
Run number | Target | Beam Current | Comment |
He3 | 22.5uA | ||
He3 | 15uA | ||
He3 | 10uA | ||
He3 | 5uA | ||
He3 | 2.5uA |
- D2 Target
Run number | Target | Beam Current | Comment |
D2 | 22.5uA | ||
D2 | 15uA | ||
D2 | 10uA | ||
D2 | 5uA | ||
D2 | 2.5uA |
- C12 Target
Run number | Target | Beam Current | Comment |
C12 | 22.5uA | ||
C12 | 15uA | ||
C12 | 10uA | ||
C12 | 5uA | ||
C12 | 2.5uA |