Difference between revisions of "BPM Calibration"

From Tritium Experiments Group
Jump to navigation Jump to search
Line 49: Line 49:
 
     <td> 12142017_02:38:06</td>
 
     <td> 12142017_02:38:06</td>
 
     <td> 12142017_02:39:57</td>
 
     <td> 12142017_02:39:57</td>
   </tr> 2:59:3
+
   </tr>
 
   <tr>
 
   <tr>
 
     <td>(0.15,3.25)</td>
 
     <td>(0.15,3.25)</td>
Line 82: Line 82:
 
     <td> 12142017_03:17:15</td>
 
     <td> 12142017_03:17:15</td>
 
     <td> 12142017_03:19:01 </td>
 
     <td> 12142017_03:19:01 </td>
 +
  </tr>
 +
 +
</table>
 +
 +
Bulls eye scan for 01/12/2018
 +
 +
<table border="1"  style="width:80%">
 +
  <tr>
 +
    <td>Relative position</td>
 +
    <td>LHRS CODA run</td>
 +
    <td>RHRS CODA run</td>
 +
    <td>Harp scan entry no.</td>
 +
    <td>HarpA time stamp </td>
 +
    <td>HarpB time stamp </td>
 +
  </tr>
 +
  <tr>
 +
    <td>(1.15,2.25)</td>
 +
    <td> </td>
 +
    <td> </td>
 +
    <td> [https://logbooks.jlab.org/entry/3504092 3504092] </td>
 +
    <td>  </td>
 +
    <td> </td>
 +
  </tr>
 +
  <tr>
 +
    <td>(2.15,3.25)</td>
 +
    <td> </td>
 +
    <td> </td>
 +
    <td> [https://logbooks.jlab.org/entry/3504121 3504121]</td>
 +
    <td> </td>
 +
    <td> </td>
 +
  </tr>
 +
  <tr>
 +
    <td>(0.15,3.25)</td>
 +
    <td> </td>
 +
    <td> </td>
 +
    <td> [https://logbooks.jlab.org/entry/3504130 3504130] </td>
 +
    <td>  </td>
 +
    <td> </td>
 +
  </tr>
 +
  <tr>
 +
    <td>(0.15,1.25)</td>
 +
    <td> </td>
 +
    <td> </td>
 +
    <td> [https://logbooks.jlab.org/entry/3504140 3504140] </td>
 +
    <td> </td>
 +
    <td> </td>
 +
  </tr>
 +
  <tr>
 +
    <td>(2.15,1.25)</td>
 +
    <td> </td>
 +
    <td> </td>
 +
    <td> [https://logbooks.jlab.org/entry/3504146 3504146]</td>
 +
    <td> </td>
 +
    <td> </td>
 +
  </tr>
 +
 +
  <tr>
 +
    <td>(1.15,2.25)</td>
 +
    <td>  </td>
 +
    <td> </td>
 +
    <td> [https://logbooks.jlab.org/entry/3504151 3504151]</td>
 +
    <td> </td>
 +
    <td>  </td>
 
   </tr>
 
   </tr>
  

Revision as of 09:59, 12 January 2018

Back to Tritium-Main

Back to Installation and Commissioning


BPM pedestal run (20 minutes)

1. Ask MCC to set iocse10 to Forced gain = 0.

2. Take CODA run for both Right and Left arms.

  • Use only clock triggers. T8=100
  • Need about 100k events.

3. Ask MCC to set iocse10 to auto gain.

Pedestal run: Left arm: Run: 757 and 758 ( longer one) Right: Run: 90557 and 90558 (longer one)

BPM Calibrations (Bullseye Scan) [1-2 hours]

This calibration was done in the owl shift of 12/14.2017 using both arms DAQ, however the Right arm dipole wasn't enabled. Set Beam energy (MeV) : 6418.49 Current ~6.7 uA


Relative position LHRS CODA run RHRS CODA run Harp scan entry no. HarpA time stamp HarpB time stamp
(1.15,2.25) 805 90595 3504092 12142017_01:55:06 12142017_01:58:24
(2.15,3.25) 806 90596 3504121 12142017_02:38:06 12142017_02:39:57
(0.15,3.25) 807 90597 3504130 12142017_02:49:00 12142017_02:52:45
(0.15,1.25) 808 90598 3504140 12142017_02:57:48 12142017_02:59:33
(2.15,1.25) 809 90599 3504146 12142017_03:04:43 12142017_03:08:13
(1.15,2.25) 810 90600 3504151 12142017_03:17:15 12142017_03:19:01

Bulls eye scan for 01/12/2018

Relative position LHRS CODA run RHRS CODA run Harp scan entry no. HarpA time stamp HarpB time stamp
(1.15,2.25) 3504092
(2.15,3.25) 3504121
(0.15,3.25) 3504130
(0.15,1.25) 3504140
(2.15,1.25) 3504146
(1.15,2.25) 3504151

How to perform a bulls eye scan:

1. You need unrastered beam:

    - This must be competed in phase 1! 
    - use single foil target.

2. Ask MCC to steer the beam to the nominal center of the target.

3. Wait until beam is stable and have MCC perform a harp scan for the two superharps near the target (1H04A and 1H04B) and take a CODA run for both the left and right spectrometers during the same time. Start the coda run first before asking MCC. Request MCC to make an ELOG entry with the Harp results, you should see all three harp wires. Record ELOG entry numbers and timestamps of both harpscans.

4. Ask MCC then to steer the beam to positions around the nominal center:

    - cover at least the area the raster will cover: (2,2), (2,-2), (-2,-2), (-2,2), (3,3), (-3,-3), and repeat (0,0)
    - repeat harp and CODA runs for each position

5. Record Harp scan run numbers and corresponding CODA run number for each beam position. As an example, see HALOG # 3324009.

6. Make a record of the harp scans and CODA runs in the HALOG.

How to analyze the bulls eye scan:

 - detailed instructions can be found at the Analyzing BPMs website.
 - the shift crew is not expected to analyze the bulls eye scan.

Calibration

A Calibration was completed on Dec 14th. The slides showing the results from this calibration cane be seen here