Difference between revisions of "Run Meeting: February 26th, 2018"
Line 15: | Line 15: | ||
- Controlled access while MCC is working on optics. Walk-through and detector checklist performed. Jack and others on magnets. | - Controlled access while MCC is working on optics. Walk-through and detector checklist performed. Jack and others on magnets. | ||
− | - RHRS Q1 and Dipole failed around 3pm. Dipole LHe level went to zero. Soon after lost | + | - RHRS Q1 and Dipole failed around 3pm. Dipole LHe level went to zero. Soon after lost left arm dipole too. Experts are in contact. |
Latest revision as of 22:04, 26 February 2018
Back to Main Page Daily_Run_Meetings
4:00PM Run Meeting, Counting house meeting room (200C)
Summary of past 24h:
- Very productive weekend. Running smoothly at 22uA.
- kin15: 20k, 19.4k, 19.1k for He3, H3 and D2 respectively.
- kin16: 12k events collected for He3
- Beam studies starting 9AM this morning. Parasitic data taking with empty cell while MCC was working on testing FFB system.
- Controlled access while MCC is working on optics. Walk-through and detector checklist performed. Jack and others on magnets.
- RHRS Q1 and Dipole failed around 3pm. Dipole LHe level went to zero. Soon after lost left arm dipole too. Experts are in contact.
Plan: Wait for the Dipole recovery and back to production as soon as we can. Will likely run LHRS alone first which normally recovers quickly.
Slides
BlueJeans connection info:
To join the Meeting: https://bluejeans.com/372278653