Difference between revisions of "Run Meeting: March 5th, 2018"
Jump to navigation
Jump to search
(Created page with "Back to Main Page Daily_Run_Meetings 4:00PM Run Meeting, Counting house meeting room (200C) Summary of past 24h: Plan: ===Slides=== BlueJeans connecti...") |
|||
Line 1: | Line 1: | ||
− | Back to [[Main_Page|Main Page]] [[Daily_Run_Meetings]] | + | '''Back to:''' |
+ | : [[Main_Page|Main Page]] | ||
+ | : [[Daily_Run_Meetings|Daily Run Meetings]] | ||
4:00PM Run Meeting, Counting house meeting room (200C) | 4:00PM Run Meeting, Counting house meeting room (200C) | ||
− | |||
+ | '''RC:''' Carlos Ayerbe | ||
− | Plan: | + | ==Summary of past 72h:== |
+ | |||
+ | '''Accelerator''' | ||
+ | : 7:30 - ARC magnet issues causes the beam to be off. Same problem was reported last Wednesday. ---> https://cebaf.jlab.org/dtm/open-events?event_id=3456 | ||
+ | |||
+ | <span style=color:blue>'''Friday March 2nd'''</span> | ||
+ | |||
+ | '''Swing shift''' | ||
+ | : data production | ||
+ | |||
+ | '''Owl shift''' | ||
+ | : data production | ||
+ | : Due to a misunderstanding in the crew, two runs with H2 were taken. | ||
+ | |||
+ | '''Day shift''' | ||
+ | : data production | ||
+ | : 09:27 Beam to the Hall off due to Beamstopper A-chain dropped ---> https://logbooks.jlab.org/entry/3541990 | ||
+ | |||
+ | <span style=color:blue>'''Saturday March 3rd'''</span> | ||
+ | |||
+ | '''Swing shift''' | ||
+ | : data production | ||
+ | |||
+ | '''Owl shift''' | ||
+ | : data production | ||
+ | |||
+ | '''Day shift''' | ||
+ | : data production | ||
+ | |||
+ | |||
+ | <span style=color:blue>'''Sunday March 4th'''</span> | ||
+ | |||
+ | '''Swing shift''' | ||
+ | : data production | ||
+ | |||
+ | '''Owl shift''' | ||
+ | : data production | ||
+ | |||
+ | '''Day shift''' | ||
+ | : data production | ||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | <span style=color:red>'''DATA Status'''</span> | ||
+ | |||
+ | Round IX. Column 25/(24+4). | ||
+ | |||
+ | ==Plan:== | ||
+ | |||
+ | -Changing LHRS polarity | ||
+ | -measuring positrons (LHRS) | ||
+ | -Normal running RHRS | ||
+ | |||
+ | Total: two shifts. | ||
+ | |||
+ | |||
+ | <span style=color:red>'''EXTRA:'''</span> | ||
+ | ;Monday Beam Studies | ||
+ | |||
+ | :Start 9:00 am | ||
+ | |||
+ | *opportunistic beam. | ||
+ | **FFB (2h) | ||
+ | |||
+ | *Beam OFF | ||
+ | ** 'eta' tool devel (2h) | ||
+ | **Optics (3h) | ||
+ | |||
+ | :Beam back 16:00-17:00. | ||
+ | |||
+ | ;Tuesday RF Recovery | ||
+ | |||
+ | :Start 8:30 | ||
+ | :Ends 12:30 | ||
===Slides=== | ===Slides=== | ||
+ | |||
+ | *[https://hallaweb.jlab.org/wiki/images/9/96/Pass1Overview.pdf Pass 1 Overview] (Evan) | ||
+ | *[https://wiki.jlab.org/tegwiki/images/e/e9/Beam_quailty.pdf Beam quality cut] (Bane) | ||
+ | |||
+ | Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/ | ||
BlueJeans connection info: | BlueJeans connection info: |
Revision as of 10:22, 3 March 2018
Back to:
4:00PM Run Meeting, Counting house meeting room (200C)
RC: Carlos Ayerbe
Summary of past 72h:
Accelerator
- 7:30 - ARC magnet issues causes the beam to be off. Same problem was reported last Wednesday. ---> https://cebaf.jlab.org/dtm/open-events?event_id=3456
Friday March 2nd
Swing shift
- data production
Owl shift
- data production
- Due to a misunderstanding in the crew, two runs with H2 were taken.
Day shift
- data production
- 09:27 Beam to the Hall off due to Beamstopper A-chain dropped ---> https://logbooks.jlab.org/entry/3541990
Saturday March 3rd
Swing shift
- data production
Owl shift
- data production
Day shift
- data production
Sunday March 4th
Swing shift
- data production
Owl shift
- data production
Day shift
- data production
DATA Status
Round IX. Column 25/(24+4).
Plan:
-Changing LHRS polarity -measuring positrons (LHRS) -Normal running RHRS
Total: two shifts.
EXTRA:
- Monday Beam Studies
- Start 9:00 am
- opportunistic beam.
- FFB (2h)
- Beam OFF
- 'eta' tool devel (2h)
- Optics (3h)
- Beam back 16:00-17:00.
- Tuesday RF Recovery
- Start 8:30
- Ends 12:30
Slides
- Pass 1 Overview (Evan)
- Beam quality cut (Bane)
Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/
BlueJeans connection info:
To join the Meeting: https://bluejeans.com/372278653