Difference between revisions of "Run Meeting: March 6th, 2018"
Jump to navigation
Jump to search
(Created page with "Back to Main Page Daily_Run_Meetings 4:00PM Run Meeting, Counting house meeting room (200C) Summary of past 24h: Plan: ===Slides=== BlueJeans connecti...") |
|||
Line 1: | Line 1: | ||
− | Back to [[Main_Page|Main Page]] [[Daily_Run_Meetings]] | + | '''Back to:''' |
+ | : [[Main_Page|Main Page]] | ||
+ | : [[Daily_Run_Meetings|Daily Run Meetings]] | ||
4:00PM Run Meeting, Counting house meeting room (200C) | 4:00PM Run Meeting, Counting house meeting room (200C) | ||
− | |||
+ | '''RC:''' Carlos Ayerbe | ||
+ | |||
+ | ==Summary of past 24h:== | ||
+ | <span style=color:red>IS ANYBODY NOT AWARE?</span> | ||
+ | |||
+ | Just in case, accelerator is down. | ||
+ | |||
+ | Min time: 3 days (but 1 pass) | ||
+ | Estimated Max time: 2 weeks | ||
+ | Worst (but best) scenario: 3 weeks | ||
Plan: | Plan: | ||
+ | |||
+ | We are in restricted access. None of the magnets should be ramped up. There is a small margin to do it, but Jessie should be consulted. | ||
+ | |||
+ | IF (big if) we get beam, it is expected for Friday. | ||
+ | |||
+ | TOMORROW: | ||
+ | |||
+ | :Ole will do some important computer maintenance at the counting house between 6am and approximately 9am | ||
+ | |||
+ | Note from Ole: | ||
+ | " To do the switch, we have to log everyone out of all the counting house machines (adaq1/2, aonl1-4, adaqsc, compton). The machines will not have to be rebooted if all goes well, but some might." | ||
+ | |||
+ | :Bob will install a new UPS for the network. | ||
===Slides=== | ===Slides=== |
Revision as of 15:49, 6 March 2018
Back to:
4:00PM Run Meeting, Counting house meeting room (200C)
RC: Carlos Ayerbe
Summary of past 24h:
IS ANYBODY NOT AWARE?
Just in case, accelerator is down.
Min time: 3 days (but 1 pass) Estimated Max time: 2 weeks Worst (but best) scenario: 3 weeks
Plan:
We are in restricted access. None of the magnets should be ramped up. There is a small margin to do it, but Jessie should be consulted.
IF (big if) we get beam, it is expected for Friday.
TOMORROW:
- Ole will do some important computer maintenance at the counting house between 6am and approximately 9am
Note from Ole: " To do the switch, we have to log everyone out of all the counting house machines (adaq1/2, aonl1-4, adaqsc, compton). The machines will not have to be rebooted if all goes well, but some might."
- Bob will install a new UPS for the network.
Slides
BlueJeans connection info:
To join the Meeting: https://bluejeans.com/372278653