Difference between revisions of "Run Meeting: April 20th, 2018"

From Tritium Experiments Group
Jump to navigation Jump to search
Line 18: Line 18:
 
injector problem (Gun HV Air Pressure Fault - bad solenoid): ~1h30 total;
 
injector problem (Gun HV Air Pressure Fault - bad solenoid): ~1h30 total;
 
2pass separator phase drift (~30 minutes)
 
2pass separator phase drift (~30 minutes)
 +
adaq1 freezing issue...
  
 
==Slides==
 
==Slides==

Revision as of 13:49, 20 April 2018

Back to:

Main Page
Daily Run Meetings

4:00PM Run Meeting, Counting house meeting room (200C)

RC: Eric Fuchey

(shifts)

e'p

Smooth data taking during the last 24h. There were only minor beam issues i.e a change in the 2nd pass separator phase.

Collected statistics: 2.3 C < charge < 2.4 C on each target at run 100255.

Down times: injector problem (Gun HV Air Pressure Fault - bad solenoid): ~1h30 total; 2pass separator phase drift (~30 minutes) adaq1 freezing issue...

Slides


BlueJeans connection info:

To join the Meeting: https://bluejeans.com/372278653