Difference between revisions of "Run Meeting: April 20th, 2018"
Jump to navigation
Jump to search
(→e'p) |
(→e'p) |
||
Line 18: | Line 18: | ||
injector problem (Gun HV Air Pressure Fault - bad solenoid): ~1h30 total; | injector problem (Gun HV Air Pressure Fault - bad solenoid): ~1h30 total; | ||
2pass separator phase drift (~30 minutes) | 2pass separator phase drift (~30 minutes) | ||
− | adaq1 freezing issue | + | adaq1 freezing issue + subsequent DAQ trouble: ~30 minutes down. |
==Slides== | ==Slides== |
Revision as of 13:53, 20 April 2018
Back to:
4:00PM Run Meeting, Counting house meeting room (200C)
RC: Eric Fuchey
e'p
Smooth data taking during the last 24h. There were only minor beam issues i.e a change in the 2nd pass separator phase.
Collected statistics: 2.3 C < charge < 2.4 C on each target at run 100255.
Down times: injector problem (Gun HV Air Pressure Fault - bad solenoid): ~1h30 total; 2pass separator phase drift (~30 minutes) adaq1 freezing issue + subsequent DAQ trouble: ~30 minutes down.
Slides