Difference between revisions of "Run Meeting: April 20th, 2018"
Jump to navigation
Jump to search
(→e'p) |
(→e'p) |
||
Line 16: | Line 16: | ||
Down times: | Down times: | ||
− | injector problem (Gun HV Air Pressure Fault - bad solenoid): ~1h30 total; | + | : injector problem (Gun HV Air Pressure Fault - bad solenoid): ~1h30 total; |
− | 2pass separator phase drift (~30 minutes) | + | : 2pass separator phase drift (~30 minutes) |
− | adaq1 freezing issue + subsequent DAQ trouble: ~30 minutes down. | + | : adaq1 freezing issue + subsequent DAQ trouble: ~30 minutes down. |
==Slides== | ==Slides== |
Latest revision as of 14:59, 20 April 2018
Back to:
4:00PM Run Meeting, Counting house meeting room (200C)
RC: Eric Fuchey
e'p
Smooth data taking during the last 24h. There were only minor beam issues i.e a change in the 2nd pass separator phase.
Collected statistics: 2.3 C < charge < 2.4 C on each target at run 100255.
Down times:
- injector problem (Gun HV Air Pressure Fault - bad solenoid): ~1h30 total;
- 2pass separator phase drift (~30 minutes)
- adaq1 freezing issue + subsequent DAQ trouble: ~30 minutes down.
Slides
BlueJeans connection info:
To join the Meeting: https://bluejeans.com/372278653