Difference between revisions of "Run Meeting: May 3rd, 2018"

From Tritium Experiments Group
Jump to navigation Jump to search
(Created page)
 
(Added some tasks for the day)
Line 8: Line 8:
  
 
[https://misportal.jlab.org/mis/physics/shiftSchedule/?experimentRunId=TRITON-2017 (shifts)]
 
[https://misportal.jlab.org/mis/physics/shiftSchedule/?experimentRunId=TRITON-2017 (shifts)]
 +
 +
==Last 24 hours==
 +
 +
* Massive network failure affecting EVERYTHING
 +
** We need to double check all of our hardware
 +
** Pick up with phase-III checkout once beam resumes.
  
 
==xB>1==
 
==xB>1==
 +
 +
* Phase III checkout
 +
* Abbridged run plan?

Revision as of 09:34, 3 May 2018

Back to:

Main Page
Daily Run Meetings

4:00PM Run Meeting, Counting house meeting room (200C)

RC: Axel Schmidt

(shifts)

Last 24 hours

  • Massive network failure affecting EVERYTHING
    • We need to double check all of our hardware
    • Pick up with phase-III checkout once beam resumes.

xB>1

  • Phase III checkout
  • Abbridged run plan?