Difference between revisions of "Run Meeting: May 3rd, 2018"
Jump to navigation
Jump to search
(Added some tasks for the day) |
m (Spelling mistake) |
||
Line 18: | Line 18: | ||
* Phase III checkout | * Phase III checkout | ||
− | * | + | * Abridged run plan? |
Latest revision as of 09:34, 3 May 2018
Back to:
4:00PM Run Meeting, Counting house meeting room (200C)
RC: Axel Schmidt
Last 24 hours
- Massive network failure affecting EVERYTHING
- We need to double check all of our hardware
- Pick up with phase-III checkout once beam resumes.
xB>1
- Phase III checkout
- Abridged run plan?