Difference between revisions of "2018 Fall Run"
Line 10: | Line 10: | ||
=[[Hypernuclear Calibration and Production Run]]= | =[[Hypernuclear Calibration and Production Run]]= | ||
+ | This hypernuclear experiment will use three targets (H, T, and He) with two different kinematics. | ||
+ | |||
+ | Kinematics 1: E_beam = 4.3185 GeV | ||
+ | L_HRS_P0 = 2.1000 GeV/c and L_HRS_Theta0 = 13.2 degrees; | ||
+ | R_HRS_P0 = 1.8231 GeV/c and L_HRS_Theta0 = 13.2 degrees. | ||
+ | |||
+ | Kinematics 2: E_beam = 4.3185 GeV | ||
+ | L_HRS_P0 = 2.2180 GeV/c and L_HRS_Theta0 = 13.2 degrees; | ||
+ | R_HRS_P0 = 1.8231 GeV/c and L_HRS_Theta0 = 13.2 degrees. | ||
+ | |||
+ | K1 is used for the H target run only. The goal is to have both Lambda and Sigma productions in the kinematics acceptance with Sigma having about 1/2 the statistics that Lambda having. This is the key calibration data for kinematics and optics optimizations with known Lambda and Sigma masses. | ||
+ | |||
+ | K2 is used for the production run with He and T targets. The kinematics acceptance is maximized for the mass of Lnn at single Lambda separation threshold. | ||
+ | |||
+ | Run plan | ||
+ | I. Start with the H target with K1: | ||
+ | (1) check singles rates and coincidence rate; | ||
+ | (2) check coincidence timing and finalize trigger; | ||
+ | (3) check aerogel detector A1 and A2 performance; and | ||
+ | (4) take 48 hours of Lambda/Sigma production run (study PID, coincidence time spectrum, generate preliminary missing mass spectrum and verify production yield rate). | ||
+ | |||
+ | II. Production run with K2: | ||
+ | Alternating T and He targets and starting with T. Taking 8 hours of He data after each 24 hours of T data. | ||
+ | The result from He target will provide extremely important reference and information for understanding the outcome from T result. | ||
+ | |||
=[[Fall 2018 Optics Runs]]= | =[[Fall 2018 Optics Runs]]= |
Revision as of 10:43, 24 September 2018
Run Plan
Fall Installation and Commissioning
SRC Calibration and Production Run
Hypernuclear Calibration and Production Run
This hypernuclear experiment will use three targets (H, T, and He) with two different kinematics.
Kinematics 1: E_beam = 4.3185 GeV L_HRS_P0 = 2.1000 GeV/c and L_HRS_Theta0 = 13.2 degrees; R_HRS_P0 = 1.8231 GeV/c and L_HRS_Theta0 = 13.2 degrees.
Kinematics 2: E_beam = 4.3185 GeV L_HRS_P0 = 2.2180 GeV/c and L_HRS_Theta0 = 13.2 degrees; R_HRS_P0 = 1.8231 GeV/c and L_HRS_Theta0 = 13.2 degrees.
K1 is used for the H target run only. The goal is to have both Lambda and Sigma productions in the kinematics acceptance with Sigma having about 1/2 the statistics that Lambda having. This is the key calibration data for kinematics and optics optimizations with known Lambda and Sigma masses.
K2 is used for the production run with He and T targets. The kinematics acceptance is maximized for the mass of Lnn at single Lambda separation threshold.
Run plan I. Start with the H target with K1: (1) check singles rates and coincidence rate; (2) check coincidence timing and finalize trigger; (3) check aerogel detector A1 and A2 performance; and (4) take 48 hours of Lambda/Sigma production run (study PID, coincidence time spectrum, generate preliminary missing mass spectrum and verify production yield rate).
II. Production run with K2: Alternating T and He targets and starting with T. Taking 8 hours of He data after each 24 hours of T data. The result from He target will provide extremely important reference and information for understanding the outcome from T result.