Difference between revisions of "Installation and Commissioning"
Jump to navigation
Jump to search
m |
|||
Line 1: | Line 1: | ||
[https://wiki.jlab.org/tegwiki/index.php/Main_Page <B>Back to Tritium-Main</B>] | [https://wiki.jlab.org/tegwiki/index.php/Main_Page <B>Back to Tritium-Main</B>] | ||
− | + | =Installation Schedule= | |
− | + | ==Target Installation== | |
− | + | ==Other Installation (e.g.,parasitic test)== | |
==Survey Info== | ==Survey Info== | ||
− | + | ==Beam Instrumentation== | |
− | + | ==Target Positions== | |
− | + | ==Spectrometer Angles== | |
* <b>HRS-L</b> | * <b>HRS-L</b> | ||
<table border="1" style="width:80%"> | <table border="1" style="width:80%"> | ||
Line 55: | Line 55: | ||
</table> | </table> | ||
− | + | =Commissioning Schedule= | |
− | + | == [https://wiki.jlab.org/tegwiki/index.php/Optics_Calibration Optics commissioning runs] == | |
− | + | == BPM calibration runs (Bull's eye scan) == | |
<table border="1" style="width:80%"> | <table border="1" style="width:80%"> | ||
<tr> | <tr> | ||
Line 109: | Line 109: | ||
</table> | </table> | ||
− | + | == BCM calibration runs == | |
<table border="1" style="width:80%"> | <table border="1" style="width:80%"> | ||
<tr> | <tr> | ||
Line 131: | Line 131: | ||
</table> | </table> | ||
− | + | == Target Boiling Study == | |
* <b>H3 Target</b> | * <b>H3 Target</b> | ||
<table border="1" style="width:80%"> | <table border="1" style="width:80%"> | ||
Line 265: | Line 265: | ||
</table> | </table> | ||
− | + | ==Dedicated Commissioning Plans== | |
− | + | ===[[MARATHON]]=== | |
− | + | ===[[Elastic]]=== | |
− | + | ===[[(ee')]] SRC (x>1) === | |
− | + | ===[[(ee'p)]] SRC=== | |
− | + | = Beam Energy Measurements = | |
<table border="1" style="width:80%"> | <table border="1" style="width:80%"> | ||
<tr> | <tr> |
Revision as of 15:47, 25 January 2017
Installation Schedule
Target Installation
Other Installation (e.g.,parasitic test)
Survey Info
Beam Instrumentation
Target Positions
Spectrometer Angles
- HRS-L
Angle | Time | Experiment | Run Number Ranges | Report | Comment |
20 | 02/01/2017 | MARATHON | 1111 ~ 2222 | link |
- HRS-L
Angle | Time | Experiment | Run Number Ranges | Report | Comment |
20 | 02/01/2017 | MARATHON | 1111 ~ 2222 | link |
Commissioning Schedule
Optics commissioning runs
BPM calibration runs (Bull's eye scan)
Relative position | LHRS CODA run | RHRS CODA run | Harp scan entry no. |
(0,0) | |||
(2,2) | |||
(2,-2) | |||
(-2,-2) | |||
(-2,2) | |||
(3,3) | |||
(-3,-3) |
BCM calibration runs
LHRS CODA run | RHRS CODA run | BCM logger | Comments |
Target Boiling Study
- H3 Target
Run number | Target | Beam Current | Raster Size | Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Comment |
H3 | 25uA | 2x2 cm | |||||
H3 | 15uA | 2x2 cm | |||||
H3 | 5uA | 2x2 cm |
- He3 Target
Run number | Target | Beam Current | Raster Size | Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Comment |
He3 | 25uA | 2x2 cm | |||||
He3 | 15uA | 2x2 mm | |||||
He3 | 5uA | 2x2 cm |
- C12 target for a normalization check for beam-current dependent rate check.
Run number | Target | Beam Current | Raster Size | Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Comment |
Carbon-Foil | 25uA | 2x2 mm | |||||
Carbon-Foil | 15uA | 2x2 mm | |||||
Carbon-Foil | 5uA | 2x2 mm |
Dedicated Commissioning Plans
MARATHON
Elastic
(ee') SRC (x>1)
(ee'p) SRC
Beam Energy Measurements
Energy of central ray (MeV) | Dispersive mode | Halog entry |
11000.00 | ||
4400 | ||
2200 |