Difference between revisions of "Installation and Commissioning"
Jump to navigation
Jump to search
Line 162: | Line 162: | ||
** RHRS DAQ machine: adaq2 | ** RHRS DAQ machine: adaq2 | ||
** Currently Functional online analysis machines: adaq3 | ** Currently Functional online analysis machines: adaq3 | ||
+ | ** Keep only necessary CODA configurations | ||
+ | ** Setup/Test remote power cycle of all crates | ||
* Software | * Software |
Revision as of 08:53, 12 October 2017
Back to 2017 Fall Run Plan Back to Tritium-Main
Installation Schedule
Target Installation
Other Installation (e.g.,parasitic test)
Survey Info
Beam Instrumentation
Target Positions
Spectrometer Angles
- HRS-L
Angle | Time | Experiment | Run Number Ranges | Report | Comment |
20 | 02/01/2017 | MARATHON | 1111 ~ 2222 | link |
- HRS-L
Angle | Time | Experiment | Run Number Ranges | Report | Comment |
20 | 02/01/2017 | MARATHON | 1111 ~ 2222 | link |
Commissioning Plan
Before Beam
- Trigger Timing Checkout (placeholder slides)
- HRS Detector Checkout
- VDC Wire Hits (placeholder slides)
- TDC distributions of scintillators, VDCs, and GC (placeholder slides)
- FastBus ADC distributions of scintillators, GC, and calorimeters (placeholder slides)
- FlashADC distributions of scintillators, GC, and calorimeters (placeholder slides)
- Cosmic calibration of calorimeters (placeholder slides)
- HV GUI (we check this frequently anyway....)
- Document the Official HV save file
- Beamline
- Twiddle Measurement to check BPMs (placeholder slides)
- Clock run with raster on, check and compare fastbus and Flash raster signals (placeholder slides)
- Harp Checkout/Testing
- Unser Checkout/Testing
- Beam Energy Measurements System Checkout/Testing
- Optical Radiation Monitor?
- Spectrometer Angles
LHRS
Angle | Momentum | Duration | Experiment | Run Number Ranges | Report | Comment |
17.0 | 3.980 | 175 hrs | x>1 | 1111 ~ 2222 | link | |
17.0 | 3.710 | 27 hrs | x>1 | 1111 ~ 2222 | link |
RHRS
Angle | Momentum | Time | Experiment | Run Number Ranges | Report | Comment |
28.5 | 2.910 | 132 hrs | x>1 | ~90000 | link | |
28.5 | 2.715 | 75 hrs | x>1 | ~90000 | link | |
28.5 | 2.530 | 38 hrs | x>1 | ~90000 | link |
- Magnets
- Decide on scaling function for Q1s (not linear!)
- Test LHRS full momentum range
- Test RHRS full momentum range
- LHRS Initial Momentum: ??.?? GeV/c
- RHRS Initial Momentum: ??.?? GeV/c
- DAQ
- LHRS DAQ machine: adaq1
- RHRS DAQ machine: adaq2
- Currently Functional online analysis machines: adaq3
- Keep only necessary CODA configurations
- Setup/Test remote power cycle of all crates
- Software
- Demonstrate/write-up new Strip Chart procedure
- Verify BTA functionality
- Demonstrate working Podd1.6, ROOT6, replay and online plots with cosmics
- Demonstrate updated spotL/spotR code (take special run with clock trigger and raster on)
- Demonstrate updated online liveTime calculations with cosmics/clock
With First Beam
- Beamline
- Beam Centering
- Raster Size Calibration
- BPM Calibration (Bullseye scan)
- BCM Calibration
- ARC Energy Measurement (parasitic only)
- Trigger Timing Checkout
- Detector Checkout
- VDC wire hits and efficiencies
- TDC distributions of scintillators, VDCs, and GC
- fastbus ADC distributions of scintillators, GC, and calorimeters
- FlashADC distributions of scintillators and GC
- Check all scalers
- check thresholds
- HRS Optics
- Detector Calibrations
- Target
Commissioning Results
Optics commissioning runs
BPM calibration runs (Bull's eye scan)
Relative position | LHRS CODA run | RHRS CODA run | Harp scan entry no. |
(0,0) | |||
(2,2) | |||
(2,-2) | |||
(-2,-2) | |||
(-2,2) | |||
(3,3) | |||
(-3,-3) |
BCM calibration runs
Beam Current (uA) | LHRS CODA run | RHRS CODA run | BCM logger | Comments |
5 | ||||
10 | ||||
15 | ||||
20 | ||||
25 |
Target Boiling Study
- H3 Target
Run number | Target | Beam Current | Raster Size | Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Comment |
H3 | 25uA | 2x2 cm | |||||
H3 | 15uA | 2x2 cm | |||||
H3 | 5uA | 2x2 cm |
- He3 Target
Run number | Target | Beam Current | Raster Size | Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Comment |
He3 | 25uA | 2x2 cm | |||||
He3 | 15uA | 2x2 mm | |||||
He3 | 5uA | 2x2 cm |
- C12 target for a normalization check for beam-current dependent rate check.
Run number | Target | Beam Current | Raster Size | Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Comment |
Carbon-Foil | 25uA | 2x2 mm | |||||
Carbon-Foil | 15uA | 2x2 mm | |||||
Carbon-Foil | 5uA | 2x2 mm |
Beam Energy Measurements
Energy of central ray (MeV) | Dispersive mode | Halog entry |
11000.00 | ||
4400 | ||
2200 |