Line 180: | Line 180: | ||
<li> [[Beam Centering]] | <li> [[Beam Centering]] | ||
<li> [[Raster Size Calibration]] | <li> [[Raster Size Calibration]] | ||
− | <li> [[BPM Calibration]] (Bullseye scan) | + | <li> [[BPM Calibration]] (pedestal run, Bullseye scan) |
<li> [[BCM Calibration]] | <li> [[BCM Calibration]] | ||
<li> [[ARC Energy Measurement]] (parasitic only) | <li> [[ARC Energy Measurement]] (parasitic only) | ||
Line 187: | Line 187: | ||
<li> Trigger Timing Checkout | <li> Trigger Timing Checkout | ||
− | <li> Detector Checkout | + | <li> Detector Checkout with single foil, multi foils, and target cells |
<ol> | <ol> | ||
<li> VDC wire hits and efficiencies | <li> VDC wire hits and efficiencies | ||
Line 197: | Line 197: | ||
</ol> | </ol> | ||
− | <li> HRS Optics | + | <li> Boiling Study at 17 degree on 3H, 3He, 2H, H targets and empty cell |
+ | |||
+ | <li> HRS Optics with saturated Q1 (LHRS p0>3 GeV, RHRS?) | ||
+ | <ol> | ||
+ | <li> Multifoil target: | ||
+ | <ol> | ||
+ | <li> one DIS run without sieve for y-target calibration | ||
+ | <li> sieve on, take a long DIS run for theta, phi calibration | ||
+ | </ol> | ||
+ | <li> Hydrogen target: elastic peak check (move RHRS to a larger angle), and delta scan at +-2%, +-4% of elastic peak | ||
+ | </ol> | ||
<li> Detector Calibrations | <li> Detector Calibrations | ||
− | + | ||
</ol> | </ol> |
Revision as of 17:41, 7 November 2017
Back to 2017 Fall Run Plan Back to Tritium-Main
Installation Schedule
Target Installation
Other Installation (e.g.,parasitic test)
Survey Info
Beam Instrumentation
Target Positions
Spectrometer Angles
- HRS-L
Angle | Time | Experiment | Run Number Ranges | Report | Comment |
20 | 02/01/2017 | MARATHON | 1111 ~ 2222 | link |
- HRS-L
Angle | Time | Experiment | Run Number Ranges | Report | Comment |
20 | 02/01/2017 | MARATHON | 1111 ~ 2222 | link |
Commissioning Plan
Before Beam
- Trigger Timing Checkout (placeholder slides)
- HRS Detector Checkout
- VDC Wire Hits (placeholder slides)
- TDC distributions of scintillators, VDCs, and GC (placeholder slides)
- FastBus ADC distributions of scintillators, GC, and calorimeters (placeholder slides)
- FlashADC distributions of scintillators, GC, and calorimeters (placeholder slides)
- Cosmic calibration of calorimeters (placeholder slides)
- HV GUI (we check this frequently anyway....)
- Document the Official HV save file
- Beamline
- Twiddle Measurement to check BPMs (placeholder slides)
- Clock run with raster on, check and compare fastbus and Flash raster signals (placeholder slides)
- Harp Checkout/Testing
- Unser Checkout/Testing
- Beam Energy Measurements System Checkout/Testing
- Optical Radiation Monitor?
- Spectrometer Angles
LHRS
Angle | Momentum | Duration | Experiment | Run Number Ranges | Report | Comment |
17.0 | 3.980 | 175 hrs | x>1 | 1111 ~ 2222 | link | |
17.0 | 3.710 | 27 hrs | x>1 | 1111 ~ 2222 | link |
RHRS
Angle | Momentum | Time | Experiment | Run Number Ranges | Report | Comment |
28.5 | 2.910 | 132 hrs | x>1 | ~90000 | link | |
28.5 | 2.715 | 75 hrs | x>1 | ~90000 | link | |
28.5 | 2.530 | 38 hrs | x>1 | ~90000 | link |
- Magnets
- Decide on scaling function for Q1s (not linear!)
- Test LHRS full momentum range
- Test RHRS full momentum range
- LHRS Initial Momentum: ??.?? GeV/c
- RHRS Initial Momentum: ??.?? GeV/c
- DAQ
- LHRS DAQ machine: adaq1
- RHRS DAQ machine: adaq2
- Currently Functional online analysis machines: adaq3
- Keep only necessary CODA configurations
- Setup/Test remote power cycle of all crates
- Software
- Demonstrate/write-up new Strip Chart procedure
- Verify BTA functionality
- Demonstrate working Podd1.6, ROOT6, replay and online plots with cosmics
- Demonstrate updated spotL/spotR code (take special run with clock trigger and raster on)
- Demonstrate updated online liveTime calculations with cosmics/clock
With First Beam
- Beamline
- Beam Centering
- Raster Size Calibration
- BPM Calibration (pedestal run, Bullseye scan)
- BCM Calibration
- ARC Energy Measurement (parasitic only)
- Trigger Timing Checkout
- Detector Checkout with single foil, multi foils, and target cells
- VDC wire hits and efficiencies
- TDC distributions of scintillators, VDCs, and GC
- fastbus ADC distributions of scintillators, GC, and calorimeters
- FlashADC distributions of scintillators and GC
- Check all scalers
- check thresholds
- Boiling Study at 17 degree on 3H, 3He, 2H, H targets and empty cell
- HRS Optics with saturated Q1 (LHRS p0>3 GeV, RHRS?)
- Multifoil target:
- one DIS run without sieve for y-target calibration
- sieve on, take a long DIS run for theta, phi calibration
- Hydrogen target: elastic peak check (move RHRS to a larger angle), and delta scan at +-2%, +-4% of elastic peak
- Multifoil target:
- Detector Calibrations
Commissioning Results
Optics commissioning runs
BPM calibration runs (Bull's eye scan)
Relative position | LHRS CODA run | RHRS CODA run | Harp scan entry no. |
(0,0) | |||
(2,2) | |||
(2,-2) | |||
(-2,-2) | |||
(-2,2) | |||
(3,3) | |||
(-3,-3) |
BCM calibration runs
Beam Current (uA) | LHRS CODA run | RHRS CODA run | BCM logger | Comments |
5 | ||||
10 | ||||
15 | ||||
20 | ||||
25 |
Target Boiling Study
- H3 Target
Run number | Target | Beam Current | Raster Size | Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Comment |
H3 | 25uA | 2x2 cm | |||||
H3 | 15uA | 2x2 cm | |||||
H3 | 5uA | 2x2 cm |
- He3 Target
Run number | Target | Beam Current | Raster Size | Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Comment |
He3 | 25uA | 2x2 cm | |||||
He3 | 15uA | 2x2 mm | |||||
He3 | 5uA | 2x2 cm |
- C12 target for a normalization check for beam-current dependent rate check.
Run number | Target | Beam Current | Raster Size | Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Comment |
Carbon-Foil | 25uA | 2x2 mm | |||||
Carbon-Foil | 15uA | 2x2 mm | |||||
Carbon-Foil | 5uA | 2x2 mm |
Beam Energy Measurements
Energy of central ray (MeV) | Dispersive mode | Halog entry |
11000.00 | ||
4400 | ||
2200 |