Difference between revisions of "Meeting-7DEC2015"
Line 2: | Line 2: | ||
Links to talks. | Links to talks. | ||
− | E12-14-011 Proton and Neutron Momentum Distributions in A = 3 Asymmetric Nuclei Larry Weinstein | + | E12-14-011 Proton and Neutron Momentum Distributions in A = 3 Asymmetric Nuclei Larry Weinstein |
− | E12-11-112 Precision Measurement of the Isospin Dependence in the 2N and 3N Short Range Correlation Region Patricia Solvignon | + | |
− | E12-10-103 Measurement of the F2n/F2p, d/u Ratios and A=3 EMC Effect | + | E12-11-112 Precision Measurement of the Isospin Dependence in the 2N and 3N Short Range Correlation Region Patricia Solvignon |
− | E12-14-009 Ratio of the Electric Form Factor in the Mirror Nuclei 3He and 3H Douglas Higinbotham | + | |
+ | E12-10-103 Measurement of the F2n/F2p, d/u Ratios and A=3 EMC Effect off Mirror Nuclei Makis Petratos | ||
+ | |||
+ | E12-14-009 Ratio of the Electric Form Factor in the Mirror Nuclei 3He and 3H Douglas Higinbotham | ||
Status of Experiment (10:45-12:15) | Status of Experiment (10:45-12:15) |
Revision as of 11:01, 12 February 2016
Links to talks.
E12-14-011 Proton and Neutron Momentum Distributions in A = 3 Asymmetric Nuclei Larry Weinstein
E12-11-112 Precision Measurement of the Isospin Dependence in the 2N and 3N Short Range Correlation Region Patricia Solvignon
E12-10-103 Measurement of the F2n/F2p, d/u Ratios and A=3 EMC Effect off Mirror Nuclei Makis Petratos
E12-14-009 Ratio of the Electric Form Factor in the Mirror Nuclei 3He and 3H Douglas Higinbotham
Status of Experiment (10:45-12:15) 10:45 Target Status Dave Meekins 11:05 Infrastructure for Tritium Robin Wines 11:25 BigBite Equipment Status TBD 11:45 HRS Status Barak Schmookler 12:00 Normal Conducting HRS Quad Issues (discussion)
Lunch Break (12:15 – 1:30)
Hall Configuration, Documentation, Training, Reviews (1:30 - 3:00) 1:30 Hall A & Target Safety Issues Dave Meekins 1:50 Experiment Kinematics (Use of BigBite and/or HRS) John Arrington 2:10 Documentation Douglas Higinbotham 2:30 Upcoming Reviews and Requirements Patrizia Rossi
Coffee Break
Optimization of Experiment Plan with Tritium (3:15 - 4:00)
Group Discussion to finalize best combined run plan Thia Keppel
Discussion & Assignment of Tasks (4:00 – 4:45)
Group Discussion Douglas Higinbotham