[https://wiki.jlab.org/tegwiki/index.php/Installation_and_Commissioning <b>Back to Installation and Commissioning</b>] | [https://wiki.jlab.org/tegwiki/index.php/Installation_and_Commissioning <b>Back to Installation and Commissioning</b>] | ||
+ | |||
+ | * Note: Boiling Study is mainly carried out on HRS-L at higher rate while the HRS-R will have less rate because of the higher P0 value. | ||
* <b>H3 Target</b> | * <b>H3 Target</b> |
Revision as of 21:41, 30 November 2017
Back to Installation and Commissioning
- Note: Boiling Study is mainly carried out on HRS-L at higher rate while the HRS-R will have less rate because of the higher P0 value.
- H3 Target
Run number | Target | Beam Current | Raster Size | Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Comment |
H3 | 22.5uA | 2x2 cm | 4.3 | 2.6 | 17 | ||
H3 | 20uA | 2x2 cm | 4.3 | 2.6 | 17 | ||
H3 | 12uA | 2x2 cm | 4.3 | 2.6 | 17 | ||
H3 | 7uA | 2x2 cm | 4.3 | 2.6 | 17 | ||
H3 | 3uA | 2x2 cm | 4.3 | 2.6 | 17 |
- He3 Target
Run number | Target | Beam Current | Raster Size | Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Comment |
He3 | 22.5uA | 2x2 cm | 4.3 | 2.6 | 17 | ||
He3 | 20uA | 2x2 mm | 4.3 | 2.6 | 17 | ||
He3 | 12uA | 2x2 mm | 4.3 | 2.6 | 17 | ||
He3 | 7uA | 2x2 cm | 4.3 | 2.6 | 17 | ||
He3 | 3uA | 2x2 cm | 4.3 | 2.6 | 17 |
- C12 target for a normalization check for beam-current dependent rate check.
Run number | Target | Beam Current | Raster Size | Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Comment |
Carbon-Foil | 22.5uA | 2x2 mm | 4.3 | 2.6 | 17 | ||
Carbon-Foil | 20uA | 2x2 mm | 4.3 | 2.6 | 17 | ||
Carbon-Foil | 12uA | 2x2 mm | 4.3 | 2.6 | 17 | ||
Carbon-Foil | 7uA | 2x2 mm | 4.3 | 2.6 | 17 | ||
Carbon-Foil | 3uA | 2x2 mm | 4.3 | 2.6 | 17 |