− | * Note: Boiling Study is mainly carried out on HRS-L at higher rate while the HRS-R will have less rate because of the higher P0 value. | + | * Note: Boiling Study is mainly carried out on HRS-L at higher rate while the HRS-R will have less rate because of the higher P0 value. At the moment the dipole of the HRS-R is not working, therefore, only the left arm will be used for the boiling study. |
* <b>H3 Target</b> | * <b>H3 Target</b> |
Revision as of 21:53, 13 December 2017
Back to Installation and Commissioning
- Note: Boiling Study is mainly carried out on HRS-L at higher rate while the HRS-R will have less rate because of the higher P0 value. At the moment the dipole of the HRS-R is not working, therefore, only the left arm will be used for the boiling study.
- H3 Target
Run number | Target | Beam Current | Raster Size | Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Comment |
H3 | 22.5uA | 2x2 cm | 4.3 | 2.6 | 17 | ||
H3 | 20uA | 2x2 cm | 4.3 | 2.6 | 17 | ||
H3 | 12uA | 2x2 cm | 4.3 | 2.6 | 17 | ||
H3 | 7uA | 2x2 cm | 4.3 | 2.6 | 17 | ||
H3 | 3uA | 2x2 cm | 4.3 | 2.6 | 17 |
- He3 Target
Run number | Target | Beam Current | Raster Size | Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Comment |
He3 | 22.5uA | 2x2 cm | 4.3 | 2.6 | 17 | ||
He3 | 20uA | 2x2 mm | 4.3 | 2.6 | 17 | ||
He3 | 12uA | 2x2 mm | 4.3 | 2.6 | 17 | ||
He3 | 7uA | 2x2 cm | 4.3 | 2.6 | 17 | ||
He3 | 3uA | 2x2 cm | 4.3 | 2.6 | 17 |
- Empty-Target-Cell for checking the aluminium contamination from end-cups in the gas
Run number | Target | Beam Current | Raster Size | Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Comment |
Empty-Cell | 22.5uA | 2x2 mm | 4.3 | 2.6 | 17 | Need to have close statistics compared with H3/He3 in the central region after cutting out the end-cups |
- C12 target for a normalization check for beam-current dependent rate check (Share the data set with BCM calibration date.
Run number | Target | Beam Current | Raster Size | Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Comment |
Carbon-Foil | 22.5uA | 2x2 mm | 4.3 | 2.6 | 17 | ||
Carbon-Foil | 20uA | 2x2 mm | 4.3 | 2.6 | 17 | ||
Carbon-Foil | 12uA | 2x2 mm | 4.3 | 2.6 | 17 | ||
Carbon-Foil | 7uA | 2x2 mm | 4.3 | 2.6 | 17 | ||
Carbon-Foil | 3uA | 2x2 mm | 4.3 | 2.6 | 17 |