Difference between revisions of "Target Boiling Study"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
[https://wiki.jlab.org/tegwiki/index.php/Installation_and_Commissioning <b>Back to Installation and Commissioning</b>] | [https://wiki.jlab.org/tegwiki/index.php/Installation_and_Commissioning <b>Back to Installation and Commissioning</b>] | ||
− | * E0 = 2.2 GeV, Ep = 2.13 GeV/c, Theta = 17 Degrees, *Raster On* (2mmx2mm) | + | * E0 = 2.2 GeV, Ep = 2.13 GeV/c, Theta = 17 Degrees, *Raster On* (2.5mmx2mm MCC = 2mmx2mm on target) |
* | * | ||
* <b>H3 Target</b> | * <b>H3 Target</b> |
Revision as of 10:11, 15 December 2017
Back to Installation and Commissioning
- E0 = 2.2 GeV, Ep = 2.13 GeV/c, Theta = 17 Degrees, *Raster On* (2.5mmx2mm MCC = 2mmx2mm on target)
- H3 Target
Run number | Target | Beam Current | Comment |
H3 | 22.5uA | ||
H3 | 15uA | ||
H3 | 10uA | ||
H3 | 5uA | ||
H3 | 2.5uA |
- He3 Target
Run number | Target | Beam Current | Comment |
He3 | 22.5uA | ||
He3 | 15uA | ||
He3 | 10uA | ||
He3 | 5uA | ||
He3 | 2.5uA |
- D2 Target
Run number | Target | Beam Current | Comment |
D2 | 22.5uA | ||
D2 | 15uA | ||
D2 | 10uA | ||
D2 | 5uA | ||
D2 | 2.5uA |
- H2 Target
Run number | Target | Beam Current | Comment |
H2 | 22.5uA | ||
H2 | 15uA | ||
H2 | 10uA | ||
H2 | 5uA | ||
H2 | 2.5uA |
- C12 Target
Run number | Target | Beam Current | Comment |
C12 | 22.5uA | ||
C12 | 15uA | ||
C12 | 10uA | ||
C12 | 5uA | ||
C12 | 2.5uA |