Difference between revisions of "Target Boiling Study"
Jump to navigation
Jump to search
m |
m |
||
Line 2: | Line 2: | ||
* E0 = 2.2 GeV, Ep = 2.00 GeV/c, Theta = 17 Degrees, *Raster On* (2.5mmx2mm MCC = 2mmx2mm on target) | * E0 = 2.2 GeV, Ep = 2.00 GeV/c, Theta = 17 Degrees, *Raster On* (2.5mmx2mm MCC = 2mmx2mm on target) | ||
− | + | ||
* <b>Empty-Cell Target</b> | * <b>Empty-Cell Target</b> | ||
<table border="1" style="width:80%"> | <table border="1" style="width:80%"> | ||
Line 19: | Line 19: | ||
</table> | </table> | ||
+ | |||
+ | * For the rest of the run, take 100K Events for each run after cutting |VZ|<7.5cm. (Will update this number with a correction factor from the Empty-Target Cell run) | ||
+ | |||
* <b>H2 Target</b> | * <b>H2 Target</b> | ||
<table border="1" style="width:80%"> | <table border="1" style="width:80%"> |
Revision as of 16:52, 15 December 2017
Back to Installation and Commissioning
- E0 = 2.2 GeV, Ep = 2.00 GeV/c, Theta = 17 Degrees, *Raster On* (2.5mmx2mm MCC = 2mmx2mm on target)
- Empty-Cell Target
Run number | Target | Beam Current | Comment |
Empty Cell | 22.5uA | 100K Events after cut |VZ|<7.5cm |
- For the rest of the run, take 100K Events for each run after cutting |VZ|<7.5cm. (Will update this number with a correction factor from the Empty-Target Cell run)
- H2 Target
Run number | Target | Beam Current | Comment |
H2 | 22.5uA | ||
H2 | 15uA | ||
H2 | 10uA | ||
H2 | 5uA | ||
H2 | 2.5uA |
- H3 Target
Run number | Target | Beam Current | Comment |
H3 | 22.5uA | ||
H3 | 15uA | ||
H3 | 10uA | ||
H3 | 5uA | ||
H3 | 2.5uA |
- He3 Target
Run number | Target | Beam Current | Comment |
He3 | 22.5uA | ||
He3 | 15uA | ||
He3 | 10uA | ||
He3 | 5uA | ||
He3 | 2.5uA |
- D2 Target
Run number | Target | Beam Current | Comment |
D2 | 22.5uA | ||
D2 | 15uA | ||
D2 | 10uA | ||
D2 | 5uA | ||
D2 | 2.5uA |
- C12 Target
Run number | Target | Beam Current | Comment |
C12 | 22.5uA | ||
C12 | 15uA | ||
C12 | 10uA | ||
C12 | 5uA | ||
C12 | 2.5uA |