Difference between revisions of "Target Boiling Study"
Jump to navigation
Jump to search
m |
m |
||
Line 1: | Line 1: | ||
[https://wiki.jlab.org/tegwiki/index.php/Installation_and_Commissioning <b>Back to Installation and Commissioning</b>] | [https://wiki.jlab.org/tegwiki/index.php/Installation_and_Commissioning <b>Back to Installation and Commissioning</b>] | ||
− | + | * E0 = 2.2 GeV | |
− | * E0 = 2.2 GeV | + | * HRS-L: Ep = 2.00 GeV/c, Theta = 17 Degrees |
+ | * HRS-R: Ep = 1.78 GeV/c, Theta = 26 Degrees | ||
+ | *Raster On* (2.5mmx2mm MCC = 2mmx2mm on target) | ||
* <b>Empty-Cell Target</b> | * <b>Empty-Cell Target</b> |
Revision as of 17:04, 15 December 2017
Back to Installation and Commissioning
- E0 = 2.2 GeV
- HRS-L: Ep = 2.00 GeV/c, Theta = 17 Degrees
- HRS-R: Ep = 1.78 GeV/c, Theta = 26 Degrees
- Raster On* (2.5mmx2mm MCC = 2mmx2mm on target)
- Empty-Cell Target
Run number | Target | Beam Current | Comment |
Empty Cell | 22.5uA | 100K Events after cut |VZ|<7.5cm | |
Empty Cell | 2.5uA | 100K Events after cut |VZ|<7.5cm |
- For the rest of the run, take 100K Events for each run after cutting |VZ|<7.5cm. (Will update this number with a correction factor from the Empty-Target Cell run)
- H1 Target
Run number | Target | Beam Current | Comment |
H1 | 22.5uA | ||
H1 | 15uA | ||
H1 | 10uA | ||
H1 | 5uA | ||
H1 | 2.5uA |
- D2 Target
Run number | Target | Beam Current | Comment |
D2 | 22.5uA | ||
D2 | 15uA | ||
D2 | 10uA | ||
D2 | 5uA | ||
D2 | 2.5uA |
- H3 Target
Run number | Target | Beam Current | Comment |
H3 | 22.5uA | ||
H3 | 15uA | ||
H3 | 10uA | ||
H3 | 5uA | ||
H3 | 2.5uA |
- He3 Target
Run number | Target | Beam Current | Comment |
He3 | 22.5uA | ||
He3 | 15uA | ||
He3 | 10uA | ||
He3 | 5uA | ||
He3 | 2.5uA |
- C12 Target
Run number | Target | Beam Current | Comment |
C12 | 22.5uA | ||
C12 | 15uA | ||
C12 | 10uA | ||
C12 | 5uA | ||
C12 | 2.5uA |