Difference between revisions of "Run Meeting: February 26th, 2018"
(Created page with "Back to Main Page Daily_Run_Meetings 4:00PM Run Meeting, Counting house meeting room (200C) Summary of past 24h: Plan: ===Slides=== BlueJeans connecti...") |
|||
Line 4: | Line 4: | ||
Summary of past 24h: | Summary of past 24h: | ||
+ | - Very productive weekend. Running smoothly at 22uA. | ||
+ | - kin15: 20k, 19.4k, 19.1k for He3, H3 and D2 respectively. | ||
+ | - kin16: 12k events collected for He3 | ||
+ | - Beam studies starting 9AM this morning. Parasitic data taking with empty cell while MCC was working on testing FFB system. | ||
+ | - Controlled access while MCC is working on optics. Walk-through and detector checklist performed. Jack and others on magnets. | ||
+ | - RHRS Q1 and Dipole failed around 3pm. Dipole LHe level went to zero. Soon after lost light arm dipole too. Experts are in contact. | ||
+ | |||
− | + | Plan: Wait for the Dipole recovery and back to production as soon as we can. Will likely run LHRS alone first which normally recovers quickly. | |
− | Plan: | ||
===Slides=== | ===Slides=== |
Revision as of 16:51, 26 February 2018
Back to Main Page Daily_Run_Meetings
4:00PM Run Meeting, Counting house meeting room (200C)
Summary of past 24h: - Very productive weekend. Running smoothly at 22uA. - kin15: 20k, 19.4k, 19.1k for He3, H3 and D2 respectively. - kin16: 12k events collected for He3 - Beam studies starting 9AM this morning. Parasitic data taking with empty cell while MCC was working on testing FFB system. - Controlled access while MCC is working on optics. Walk-through and detector checklist performed. Jack and others on magnets. - RHRS Q1 and Dipole failed around 3pm. Dipole LHe level went to zero. Soon after lost light arm dipole too. Experts are in contact.
Plan: Wait for the Dipole recovery and back to production as soon as we can. Will likely run LHRS alone first which normally recovers quickly.
Slides
BlueJeans connection info:
To join the Meeting: https://bluejeans.com/372278653