Difference between revisions of "Analysis Meeting: June 14th, 2016"

From Tritium Experiments Group
Jump to navigation Jump to search
 
Line 19: Line 19:
  
 
== Agenda ==
 
== Agenda ==
* MARATHON rate estimates by Tyler, Mike, Sheren and Tong
 
* Work summery by Dien [[:File:Dien 04 19 triton.pdf|(slides)]]
 
* R analysis - by Shujie
 
  
 
==Attendance==
 
==Attendance==

Latest revision as of 10:17, 28 June 2016

Back to Main Page >> Analysis Meetings >> Pre-experiment


Instructions

2:00 pm, CEBAF center LOBBY
We will be using the BlueJeans system.
To join via Phone:
1) Direct-dial 
+1.408.740.7256 (US)
+1.888.240.2560 (US Toll Free)
+1.408.317.9253 (Alternate number)
(all numbers)
2) Enter Meeting ID: 4845151606
3) Press #

Agenda

Attendance

  • Onsite: Buddhini, Dien, Jason and Doug


Minutes

  • There was a confusion about the meeting rooms so we the people onsite met at the lobby. There was no way to get blujeans so apologies to the off-site participants.
  • Dien had questions about the error estimates on her Cerenkov calibration plots shown at the May 31st, 2016 meeting. At that meeting Doug commented that she should re-do them but it was not clear to me or Dien what exactly he wanted her to do. So Doug made it clear that in her E/p distributions,
    • 1) the gaussian fit region was too small.
    • 2) the variation of the average mean and the fitted mean are very different. The average mean seems to be more stable than the fitted mean. This is because the fit region is too small.

Also I am noticing that the probability of the data being described by the fit is ~ 0 when it should be close to 0.5 or at least >0. Dien said she will redo the fits using ROOT Minuit.

  • Jason had sent me slides on his work updates but we didnt had time (Doug had to rush off for a meeting) or a computer to look at his work. Will do it next time.