Difference between revisions of "Run Meeting: April 23rd, 2018"

From Tritium Experiments Group
Jump to navigation Jump to search
 
Line 12: Line 12:
 
Very smooth data taking over the weekend (ABU from Friday Swing to Monday Owl > 80%).
 
Very smooth data taking over the weekend (ABU from Friday Swing to Monday Owl > 80%).
 
Uncaught, unexpected beam position drift on saturday Owl (https://logbooks.jlab.org/entry/3564453). All following beam position drifts were caught and rectified quickly.
 
Uncaught, unexpected beam position drift on saturday Owl (https://logbooks.jlab.org/entry/3564453). All following beam position drifts were caught and rectified quickly.
 +
 +
Today, MCC performed high intensity beam studies with Hall locked up. We took data on dummy target, albeit with very low efficiency.
  
 
==Slides==
 
==Slides==

Latest revision as of 12:51, 23 April 2018

Back to:

Main Page
Daily Run Meetings

4:00PM Run Meeting, Counting house meeting room (200C)

RC: Eric Fuchey

(shifts)

e'p

Very smooth data taking over the weekend (ABU from Friday Swing to Monday Owl > 80%). Uncaught, unexpected beam position drift on saturday Owl (https://logbooks.jlab.org/entry/3564453). All following beam position drifts were caught and rectified quickly.

Today, MCC performed high intensity beam studies with Hall locked up. We took data on dummy target, albeit with very low efficiency.

Slides


BlueJeans connection info:

To join the Meeting: https://bluejeans.com/372278653