Difference between revisions of "Run Meeting: Oct 29th, 2018"
Jump to navigation
Jump to search
(Created page with "'''Back to:''' : Main Page : Daily Run Meetings 3:30PM Run Meeting, Counting house meeting room (200C) '''RC:''' Carlos Ayerbe ==Summa...") |
|||
Line 7: | Line 7: | ||
'''RC:''' Carlos Ayerbe | '''RC:''' Carlos Ayerbe | ||
− | ==Summary of past | + | ==Summary of past 72h:== |
+ | |||
+ | Friday 26th | ||
'''Accelerator''' | '''Accelerator''' | ||
+ | : no relevant incidents. | ||
'''Swing shift''' | '''Swing shift''' | ||
+ | : Right HRS was alive and getting data | ||
+ | : In the last hour of Day Shift, MCC reported that our beam dump diffuser blower tripped (https://logbooks.jlab.org/entry/3615333). Jessie entered and after discuss with experts we enounter that was just a miscalibrated sensor (https://logbooks.jlab.org/entry/3615390) | ||
+ | : ~18:00 DAQ computers crashed and solved after calling Alex | ||
+ | : Right Arm detectors started to show noisy peaks, Florian was called and solved (temporarily) switching off T6. | ||
+ | : Rest of the shift as normal | ||
+ | |||
+ | Saturday 27th | ||
+ | '''Accelerator''' | ||
'''Owl shift''' | '''Owl shift''' | ||
+ | : Smooth shift | ||
+ | |||
+ | '''Day shift''' | ||
+ | |||
+ | : Smooth shift | ||
+ | |||
+ | '''Swing shift''' | ||
+ | |||
+ | : Smooth shift | ||
+ | |||
+ | Sunday 28th | ||
+ | |||
+ | '''Accelerator''' | ||
+ | |||
+ | '''Owl shift''' | ||
+ | : data production | ||
+ | : ~6:30 changed kinematics to study lower side QE peak studies with RHRS | ||
+ | : LHRS took the same data without changing its kinematics | ||
+ | : During the ramping down of RHRS, LHRS was taking 3He data | ||
'''Day shift''' | '''Day shift''' | ||
+ | : same program started before. | ||
+ | : very nice beam | ||
+ | |||
+ | '''Swing shift''' | ||
+ | : continue with DIS measurements | ||
+ | : ~18:00 LQ2 trip off, solved after a call to Jack (https://logbooks.jlab.org/entry/3616641 , https://logbooks.jlab.org/entry/3616650 ) | ||
+ | : Jack found a strange behavior on LQ2 to be investigated (https://logbooks.jlab.org/entry/3616662) | ||
+ | : ~23:20 LQ3 trips during the change of momentum (https://logbooks.jlab.org/entry/3616798) | ||
+ | : After called Jack, we (Shujie and Carlos) enter into the Hall with ARM to reset LQ3 succesfully (https://logbooks.jlab.org/entry/3616868) | ||
+ | |||
+ | '''Owl shift''' | ||
+ | |||
+ | : more data production | ||
+ | |||
+ | '''Day shift''' | ||
+ | |||
+ | : END of E12-11-112 (xB > 1) | ||
+ | : START of E12-17-003 (e,e'K) Hypernucleus | ||
+ | : We have the hall in Restricted Access. | ||
+ | : Dave Meekins warm up target | ||
+ | : Many set ups, maintenance, and upkeeps. | ||
==Plan:== | ==Plan:== | ||
− | + | : As soon most of the work is done, we should move to Controlled Access. | |
+ | : Target is expected to be cooled down tomorrow morning and ready around noon. | ||
+ | : Shifts are cancelled until half DAY shift | ||
Line 33: | Line 86: | ||
MCC scheduling Whiteboard: http://accboard.acc.jlab.org/ | MCC scheduling Whiteboard: http://accboard.acc.jlab.org/ | ||
− | Tritium | + | Tritium wiki page: https://wiki.jlab.org/tegwiki/index.php/Main_Page |
+ | |||
+ | nnΛ experiment wiki page: https://wiki.jlab.org/tegwiki/index.php/NnL_wiki | ||
− | |||
= Bluejeans connection information = | = Bluejeans connection information = |
Latest revision as of 14:27, 29 October 2018
Back to:
3:30PM Run Meeting, Counting house meeting room (200C)
RC: Carlos Ayerbe
Summary of past 72h:
Friday 26th
Accelerator
- no relevant incidents.
Swing shift
- Right HRS was alive and getting data
- In the last hour of Day Shift, MCC reported that our beam dump diffuser blower tripped (https://logbooks.jlab.org/entry/3615333). Jessie entered and after discuss with experts we enounter that was just a miscalibrated sensor (https://logbooks.jlab.org/entry/3615390)
- ~18:00 DAQ computers crashed and solved after calling Alex
- Right Arm detectors started to show noisy peaks, Florian was called and solved (temporarily) switching off T6.
- Rest of the shift as normal
Saturday 27th
Accelerator
Owl shift
- Smooth shift
Day shift
- Smooth shift
Swing shift
- Smooth shift
Sunday 28th
Accelerator
Owl shift
- data production
- ~6:30 changed kinematics to study lower side QE peak studies with RHRS
- LHRS took the same data without changing its kinematics
- During the ramping down of RHRS, LHRS was taking 3He data
Day shift
- same program started before.
- very nice beam
Swing shift
- continue with DIS measurements
- ~18:00 LQ2 trip off, solved after a call to Jack (https://logbooks.jlab.org/entry/3616641 , https://logbooks.jlab.org/entry/3616650 )
- Jack found a strange behavior on LQ2 to be investigated (https://logbooks.jlab.org/entry/3616662)
- ~23:20 LQ3 trips during the change of momentum (https://logbooks.jlab.org/entry/3616798)
- After called Jack, we (Shujie and Carlos) enter into the Hall with ARM to reset LQ3 succesfully (https://logbooks.jlab.org/entry/3616868)
Owl shift
- more data production
Day shift
- END of E12-11-112 (xB > 1)
- START of E12-17-003 (e,e'K) Hypernucleus
- We have the hall in Restricted Access.
- Dave Meekins warm up target
- Many set ups, maintenance, and upkeeps.
Plan:
- As soon most of the work is done, we should move to Controlled Access.
- Target is expected to be cooled down tomorrow morning and ready around noon.
- Shifts are cancelled until half DAY shift
Slides/Links
MCC scheduling Whiteboard: http://accboard.acc.jlab.org/
Tritium wiki page: https://wiki.jlab.org/tegwiki/index.php/Main_Page
nnΛ experiment wiki page: https://wiki.jlab.org/tegwiki/index.php/NnL_wiki
Bluejeans connection information
To join the Meeting: https://bluejeans.com/256205934
To join via Room System: Video Conferencing System: bjn.vc -or-199.48.152.152 Meeting ID : 256205934
To join via phone : 1) Dial:
+1.408.740.7256 (United States) +1.888.240.2560 (US Toll Free) +1.408.317.9253 (Alternate number) (see all numbers - http://bluejeans.com/numbers)
2) Enter Conference ID : 256205934