Difference between revisions of "Run Meeting: Nov 9th, 2018"
Jump to navigation
Jump to search
Line 9: | Line 9: | ||
==Summary of past 24h:== | ==Summary of past 24h:== | ||
− | News from the 8AM meeting | + | ===News from the 8AM meeting=== |
− | Beam studies and Recovery have switched | + | *Beam studies and Recovery have switched |
− | A tentative request for a controlled access to start around 9 on Monday during recovery | + | *A tentative request for a controlled access to start around 9 on Monday during recovery |
− | The Hall will be required to be locked up on Tuesday. MCC may need to send beam into the Hall to reach their power threshold for the test plan. | + | *The Hall will be required to be locked up on Tuesday. MCC may need to send beam into the Hall to reach their power threshold for the test plan. |
− | + | ||
− | Great beam ~76% Beam on Target for Owl shift, 80% for last night's swing shift 76% for yesterday Day. | + | *Great beam ~76% Beam on Target for Owl shift, 80% for last night's swing shift 76% for yesterday Day. |
− | A small shift in time S2 FADC TDC PMT 6 -https://logbooks.jlab.org/entry/3623194 | + | *A small shift in time S2 FADC TDC PMT 6 -https://logbooks.jlab.org/entry/3623194 |
− | Old firmware might be the cause, a shift of 4ns https://logbooks.jlab.org/entry/3623252 | + | **Old firmware might be the cause, a shift of 4ns https://logbooks.jlab.org/entry/3623252 |
==Slides/Links== | ==Slides/Links== |
Revision as of 09:49, 9 November 2018
Back to:
3:30PM Run Meeting, Counting house meeting room (200C)
RC: Jason Bane
Summary of past 24h:
News from the 8AM meeting
- Beam studies and Recovery have switched
- A tentative request for a controlled access to start around 9 on Monday during recovery
- The Hall will be required to be locked up on Tuesday. MCC may need to send beam into the Hall to reach their power threshold for the test plan.
- Great beam ~76% Beam on Target for Owl shift, 80% for last night's swing shift 76% for yesterday Day.
- A small shift in time S2 FADC TDC PMT 6 -https://logbooks.jlab.org/entry/3623194
- Old firmware might be the cause, a shift of 4ns https://logbooks.jlab.org/entry/3623252
Slides/Links
MCC scheduling Whiteboard: http://accboard.acc.jlab.org/
Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/
Tritium wiki page: https://wiki.jlab.org/tegwiki/index.php/Main_Page
Bluejeans connection information
To join the Meeting: https://bluejeans.com/256205934
To join via Room System: Video Conferencing System: bjn.vc -or-199.48.152.152 Meeting ID : 256205934
To join via phone : 1) Dial:
+1.408.740.7256 (United States) +1.888.240.2560 (US Toll Free) +1.408.317.9253 (Alternate number) (see all numbers - http://bluejeans.com/numbers)
2) Enter Conference ID : 256205934